Laserfiche WebLink
GREEN DEMOLITION <br />r � r� � <br />*. �s •1 <br />Office: 3 2-409-4771 <br />• <br />IHC Companies 2015/16/17 <br />1500 Executive Dr. <br />Elgin, IL 60123 <br />Tom Carrano <br />847-841-7713 <br />Niles North HS 2014Summer Renovation / Fenton High School Removations <br />Skokie, Il $ 1,303,676.00 <br />Scope of Work: <br />Selective and gut removals of Locker Rooms - Kitchen Cafeteria- Entrances <br />and other various areas <br />Scope of Work: <br />Main Hospital North Entrance removal of Front Structural Fagade, floors and roof with all adjoining finishes. <br />Barton Malow Company July 2015 <br />150 N Upper Wacker Dr #1650 <br />Chicago, IL 60606 <br />Brian Courtney <br />312-281-0821 <br />Argonne National Laboratory $212,0.0 <br />Argonne National Lab — Materials Engineering Building 370 <br />Building 360 Expansion <br />Scope of Work: <br />Green Demolition performed wreck removals within Building 370 adjacent to an ongoing Phosphorous <br />Experiment working in direct conjunction with electric, communications systems, sprinkler systems, natural <br />gas and steam while performing lead and asbestos abatement. Green Demolition performed a Building <br />Wreck within 10 feet of a Linear Accelerator without service interruptions to the electric, water, sewer, <br />natural gas, steam and communications systems. <br />"Recycling For A, GreenorTamorraw" <br />