Laserfiche WebLink
PROJECT NAME: DREWRY'S BREWERY CLEANUP <br />ADDENDUM NO. 4 <br />Date: July 19, 2019 <br />To: All Plan Holders <br />From: Linda M. Martin, Clerk of the Board of Public Works <br />IDEM has collected 9 samples of from the debris and were submitted for laboratory analysis. All <br />nine samples were positive for asbestos. As a result of the asbestos discovery, the following <br />information is to be added/changed to the contract documents: <br />eedfleations: <br />Section III, Bidding Requirements: <br />Add: III.B.Le. Each contractor shall submit with their bid, a plan describing <br />how the contractor plans to sample and analyze the asbestos debris. Each <br />contractor must also provide documentation showing the licensed Asbestos <br />Abatement Contractor and licensed Asbestos Abatement inspector that will be <br />involved. <br />Section XII, Prosecution and Progress: <br />Revise: XII.B.1 The project will have a completion date of t#i44 (30) sixty <br />(60) calendar days for all work. The contract time will start when the Notice <br />to Proceed is delivered and signed. <br />You must acknowledge receipt of this addendum by signing the first page, <br />returning it via facsimile to (574) 235-9171, and a copy of the first page must be <br />included with your bid. <br />��,�1�11111111111�p����� <br />W Sly' "r <br />` 1ST1i <br />PE11400362 w <br />STATE OF it <br />Sils <br />— This addendum consists of a total of 1 pages — <br />Version 4/2/2019 <br />