Laserfiche WebLink
B. Additions: <br />1. All parts shall include the following: <br />(1) Performance specifications; <br />(ii) Bill of materials <br />(iii) Warranties on all parts; and <br />(iv) Installation and safety requirements. <br />XVIII. OTHER UTILITIES <br />A. Prevailing Specifications: None <br />B. Additions: <br />1. The Contractor shall verify the locations of all utilities by contacting Holey Moley at 1-800- <br />382-5544 at least two (2) working days, not counting Saturdays, Sundays or federal and <br />state holidays before proceeding with construction. It shall also be the Contractors <br />responsibility to contact any other utility that is not contacted by Holey Moley and verify the <br />utility locations. <br />2. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, <br />telephone, etc. in order to assure that all utilities that need to be replaced or relocated can <br />be done with a minimum disturbance to service. The Contractor shall also be responsible <br />for coordinating schedules with the various utilities such that they can proceed with their <br />relocation work as efficiently as possible. <br />3. If the odor of natural gas is detected in a work area at any time during the course of work, <br />the Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall <br />also immediately notify the residents of adjacent properties. The Contractor shall advise <br />the residents to evacuate their homes immediately if the odor is present within the dwelling. <br />4. Unless an allowance is specified in the bid tab, the restoration of sprinkler systems <br />damaged by the Contractor's operations shall be repaired at no cost to the City and Owner <br />of the system. If an allowance is provided in the bid tab, the City will reimburse the <br />Contractor up to the allowance amount for sprinkler repairs. Restoration of sprinkler <br />systems damaged by the Contractor's operations exceeding the allowance will be <br />considered incidental to the contract. <br />XIX. MAINTENANCE OF TRAFFIC <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Sections 105 & 801 <br />B. Additions: <br />1. Maintenance of traffic during construction shall conform to the "Indiana Manual on Uniform <br />Traffic Control Devices" and the City of South Bend Design and Construction Standards. <br />2. The attached "Traffic Closure Request" form is to be used for any lane restrictions or <br />closures and required to be filled out and sent to the Department of Public Works. <br />3. The Contractor shall arrange and prosecute the work specified for this contract in such a <br />Version 8/1612018 Special Provisions - 7 <br />