My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Drewry's Brewery Cleanup Project No 119-031A - Green Demolition Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Drewry's Brewery Cleanup Project No 119-031A - Green Demolition Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:10:06 AM
Creation date
7/24/2019 1:37:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 107 <br />B. Additions: <br />1. The Owner, where mentioned in these documents, is the City of South Bend. The <br />Engineer, where mentioned in these documents, is the City of South Bend Division of <br />Engineering. <br />2. The Contractor shall apply for and obtain any and all required permits for the work from <br />local, state, and federal agencies and shall comply with permit requirements, including the <br />St. Joseph County / City of South Bend Building Department. <br />3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the <br />Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified <br />and registered with the Secretary of State of Indiana to engage in business within the State <br />of Indiana. <br />4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The <br />Owner reserves the right to immediately terminate the public work project awarded should <br />the Contractor be found to be in violation of any provision of Indiana Code 5-16-13 and <br />such violation shall result in the forfeiture of Contractor's performance bond to the Owner. <br />5. This project is authorized by Indiana Code Sec. 36-7-9-2 and complies with the South Bend <br />Department of Code Enforcement's Continuous Enforcement Order with regard to Case <br />No. 12-214, which was affirmed by the Hearing Officer on February 7, 2019. <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Sec. 108 <br />B. Additions: <br />1. The project will have a completion date of thirty (30) calendar days for all work. The contract <br />time will start when the Notice to Proceed is delivered and signed. <br />2. The City, Engineer, and Contractor will hold a pre -construction meeting following award of <br />the contract. The date of the Notice to Proceed will be agreed at that meeting. <br />3. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. <br />XIII. C_HANGE OF CONTRACT T' <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 108 <br />B. Additions: <br />The Contract Time may only be changed by Change Order. Any Claim for an extension in <br />the Contract Time shall be based on written notice delivered to the Department of Public <br />Works within seven (7) calendar days of the occurrence of the event giving rise to the claim. <br />Notice of the extent of the claim with supporting data shall be delivered within fourteen (14) <br />calendar days after such occurrence unless an official of the Public Works Department <br />allows an additional period of time to ascertain more accurate data. The Contract Time <br />will be extended in an amount equal to time lost to delays beyond the control of the <br />Contractor if a claim is made in accordance with this provision. Such delays shall include <br />Version 8/16/2018 Special Provisions - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.