Laserfiche WebLink
BID/PROPOSALt�w <br />CITY OF SOUTH BEND+ <br />-. <br />2019 Contractor Paving <br />ProjectNumber: - <br />Project Name: <br />119-062- <br />............ ................ <br />For Bids Due: July 23, 2019, 9:30 a.m., Local Time <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />Base Bid <br />.... <br />................ <br />Item <br />No. <br />Descri tion ..........._ . mmm www_ww <br />Quantity......— <br />Y <br />Unit <br />Unit Price <br />Unit Pri___.. <br />I <br />Item Total <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 11,000.10 <br />$ 11,000.10 <br />... <br />2 <br />.. ......... ............................. <br />Mobilization and Demobilization <br />�__.......... <br />1 <br />LS <br />$ 21,800.00 <br />$ 21,800.00 <br />3 <br />.................. ._.......ww <br />Milling, Up to 1.5" <br />_....... <br />33,800 <br />SY <br />_..... <br />$ 2.30 <br />_.... <br />$ 77,740.00 <br />4 <br />HMA Surface, 9.5 mm — Type B <br />2,800 <br />TONS <br />$ 95.00 <br />$ 266,000.00 <br />........ <br />5 <br />_ --- --- .......... _._........ ........... ........ <br />HMA Wedge and Leveling - Type B <br />69 <br />........ <br />TONS <br />150.00 <br />_.... <br />$ 10,350.00 <br />6 <br />HMA for Patching <br />500 <br />SY <br />$ 70 00 <br />$ 35,000.00 <br />_7 <br />Tack Coat .....������......... <br />20._.�.. <br />.. TONS <br />$ 1.00 <br />$ 20.0..��..._. <br />0 <br />8 <br />..........._ _.. .. ........ <br />Joint Adhesive, Surface <br />17,200 <br />LF <br />$ 0.50 <br />$ 8,600.00 <br />9 <br />... ....... .. ....................... <br />Adjust <br />ust Manhole to Grade <br />39 <br />EA <br />$ 450.00 <br />$ 17,550.00 <br />... _................... <br />10 <br />Adjust Inlet to Grade <br />17 <br />EA <br />$ 500.00 <br />$ 8,500.00 <br />................ <br />11 <br />...... ._. ........... <br />Pavement Message Marking, Thermoplastic, White, <br />$ 150.00 <br />Lane Indication Arrow <br />2 <br />EA <br />$ 300.00 <br />12 <br />._.......__.. ._.... w <br />Pavement Message Marking, Thermoplastic, White, <br />...... <br />$ 17 .. 75.00 <br />_.... <br />"ONLY" <br />2 <br />EA <br />$ 350.0 0 <br />13 <br />.... .... .....uu <br />Line, Thermoplastic, Solid, White, 4" <br />90 <br />LF <br />_... <br />$ 0 99 <br />$ 89.10 <br />14 <br />�.... <br />Transverse Marking, Thermo <br />g plastic, Solid, White, 6" <br />600 <br />LF <br />$ 0.89 <br />$ 534.00 <br />1 5 <br />Transverse Mark �n Thp <br />g, Thermoplastic, Solid, White, <br />�_. <br />$ 12.90 <br />24" <br />70 <br />LF <br />$ 903.00 <br />16 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />1,150 <br />LF <br />$ 0.74 <br />$ 851.00 <br />17 <br />.... .............. ......�............. .... <br />Line, Thermoplastic, Broken, Yellow, 4" <br />930 <br />LF <br />$ 0.74 <br />$ 688.20 <br />.._._... <br />18 <br />.......... _u ---- _...... <br />Grooving for Pavement Markings, 4" <br />21160 <br />._.......... <br />LF <br />_ <br />$ 0.46 <br />.._ <br />$ 993.60 <br />Base Bid <br />Total <br />$461,269.00 <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />