Laserfiche WebLink
ANCON <br />CONSTRUCTION CO., INC. <br />ProJect: Leeper Park Improvements <br />Job No: 173041 <br />PCO No. 02 <br />Reference: Replace additional 24" drain pipe with DIP <br />Date: 6/1412019 <br />Description: Replace approximately 40'of clay drain pipe with 24" ductile iron pipe <br />Includes: 1. Provide and install 24" D.I.P. 40 linear feet to the north of STR. 1001 <br />2. Dewatring is included <br />Excludes: <br />Change Order Amount: $ 14,043.70 <br />Should you need any additional supportive documentation and/or breakdown, please call us at your convenience. Thank <br />you for your prompt review and cooperation. <br />Approval: <br />Authorized Signature: <br />Sean Welty <br />Project Manager Date of'Approval: <br />Ancon Construction <br />