My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Water Works North Pumping Station Well Replacement Project No 117-031 - Peerless Midwest Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Water Works North Pumping Station Well Replacement Project No 117-031 - Peerless Midwest Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:50:51 PM
Creation date
7/24/2019 1:25:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�4 <br />�wDEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />1 1 7-031 R Walo,VWorls Nudh Pumping Station Well �2e�ykwum�sm�41 <br />Project Number: Project Name: Change Order #: <br />DATE INITIATED; 6/18/2019 BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Additional Cost for unanticipated Bypass Pumping Labor and Traffic Control. <br />Attachments: (List documents support change — required) <br />Bypass Pumping Labor and Traffic Control Cost Breakdown. <br />Amount of B Increase/ ❑ Decrease: $ 9462.72 <br />[Categories (Pick One): <br />Previously approved Change Order(s): $ 0 ❑ Scope of Work <br />..... _ ® Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 1 .78 <br />❑ Conflicted Specifications and Drawings <br />❑ Failed Materials <br />New Total Amount: $ 542,225.72 <br />❑ Error <br />❑ Omission <br />Total Percent of Change: 1 .78 <br />," p n 1 ❑ Final Quantity Adjustment <br />Funding Secured From: IT�uV� Ct�'1 <br />11 <br />(filled out by PM) <br />RECOMMENDED BY: <br />Josh Ehmer 6/24/2019 <br />Project Inspector (Print Name) (Signat ) (Date) <br />REVIEWED BY: ti <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) (Signature) (Da e) <br />APPRO ED BY: <br />0 <br />City E ineer (Print am,) (sign turq) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.