My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - 2019 Small Drainage Project No 119-019A - Selge Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - 2019 Small Drainage Project No 119-019A - Selge Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:13:44 AM
Creation date
7/24/2019 1:22:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />fH0 <br />Project Number: 119-019A Project Name: 2019 Small Drainage - Lathrop Change Order #: 1 <br />DATE INITIATED 7/9/2019 BPW DATE: _. <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Located manhole structure and lid 6 feet below the surface. Found the pipe to be busted and <br />Installed a new manhole. <br />Attachments: (List documents support change — required) <br />Contractors pricing. <br />Amount of BIncrease / ❑Decrease: $ 1 1 ,840.40 <br />......................................... _.... _...... _ Categories (Pick One): <br />Previously approved Change Order(s): $ 0 ❑ Scope of Work <br />��_-— B Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 47'81 % ❑ Conflicted Specifications and Drawings <br />36,605.40 El Failed Materials <br />New Total Amount $�,�, ❑ Error <br />47.81 El Omission <br />Total Percent of Change: ............. % ❑ Final Quantity Adjustment <br />--� _. 2- 0 <br />Funding Secured From: � �.�""�.�_. <br />(filled out by PM) <br />RECOMMENDED BY: <br />Josh Ehmer .�� m 7/9/2019 <br />Project Inspector (Print Name) (Sigriatur (Date) <br />REVIEWED BY: <br />____ ....... ......... ......... <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVED BY <br />, : <br />City Engineer (Print Na o) (Signature) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.