My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - 2019 Small Drainage Project No 119-019A - Selge Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - 2019 Small Drainage Project No 119-019A - Selge Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:13:44 AM
Creation date
7/24/2019 1:22:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2) Once the manhole was found and uncovered, it was filled with debris, which the City's <br />vactor would not be of use to clean it out. The City directed Selge to install a new structure <br />at the north end of the alley and abandon the upstream sewer and manhole. <br />3) The specifications did not provide a RIM elevation or directions on where to set the RIM <br />of the replaced catch basin in Lathrop. Due to many layers of asphalt on Lathrop and the <br />need to mill down several inches, the City directed Selge to lower the newly installed catch <br />basin to allow room for new asphalt to be placed around the inlet. Pavement cores had <br />not been performed and the depth of milling was not determined until after construction of <br />the catch basin. <br />Any questions, please contact Kara Boyles in my absence. <br />S:\Public Works\Projects\Projects by Year\2019 Projects\l 19-019A 2019 Small Drainage\4 - Construction\] - Agenda Requests and Change <br />Orders\Change Order I Memo.doex <br />
The URL can be used to link to this page
Your browser does not support the video tag.