Laserfiche WebLink
City of South Bend <br />Adam Parson, Project Manager <br />Via email to: ga.Icons0o hdiin gg <br />Adam: <br />3215 SUGAR MAPLE COURT, SUITE B <br />SOUTH BEND, INDIANA 4(o(o28 <br />PHONE: 514-282-2998 FAX: 514-252-2994 <br />A SQUARE DEALTM SINCE 19(o8 <br />WWW.CRUMLISHAND CRUMLISH.COM <br />June 5, 2019 <br />2018 County -City Bldg Remodels <br />CONTRACT AMENDMENT 1 <br />It is our pleasure to offer this proposal to separate the construction drawing portion of our project fee for the <br />131h floor of the County City Building, for City of South Bend Code Enforcement Department offices. <br />We will continue to prepare final construction drawings and outline specifications (on drawings - no spec <br />book) for Code Enforcement, based on the designs created late last year. This work will become a separate <br />'sub -project' of the entire CCB Remodeling which were contracted to perform. This sub -project will require a <br />separate submittal to IN DHS for State Plan Review (ahead of the other Departments in September 2019). <br />The reason for this contract amendment is due to the urgency of Code Enforcement in proceeding with their <br />Vestibule portion of their work ahead of (expedited over) other departments in the County City Building which <br />we did not intend to complete until September 2019. <br />• Develop separate bidding documents and drawing specifications of previously accepted schemat- <br />ics. However only limited MEP documentation due to limited MEP knowledge within CCB. <br />Contract Fee Addition of +$3,000.00 <br />We cannot promise this project will garner full approval from IN DHS, as this is a modification of the egress <br />path in the office suite (however we believe it to be a code -compliant impediment - with an egress door). If <br />this design is unacceptable to IN DHS Plan Review, a variance request may yet be necessary, due to the age <br />of the building and the differences in current building code from original construction codes. <br />The City of South Bend will become responsible for bidding/quoting the project, and IN DHS mandated project <br />supervision. <br />Any further additional services beyond those listed above will be charged at our office standard rates of <br />$125/hr for Professional Staff (licensed/registered) and $75/hr for Technical Staff. Any reimbursable expenses <br />for such items as plan review fees, blueprints, shipping, etc. will be charged in addition to above fee. <br />With our current workload of design and construction documents for existing projects and clients, we can fore- <br />cast our ability to complete these separate construction drawings on or about July 1, 2019. After which time <br />we will resume work on the remaining portions of our original CCB remodeling contract. <br />If you have any questions, please don't hesitate to contact me. We are ready to serve the City of South Bend! <br />Sincerely, <br />Brendan Crumlish, NCARB, CCS, RA, RID, LEED GA <br />President, and IN Licensed Architect 870155 <br />