Laserfiche WebLink
C) South Bend represents that it will, at all times, operate and maintain its <br />WWTP in an efficient manner. There is sufficient capacity in the WWTP to <br />receive and treat the additional daily flow from the Project Area. In the <br />unlikely event of a temporary or partial failure of the South Bend's waste <br />water treatment service, such temporary or partial failure shall be remedied <br />with all possible dispatch. The service level provided to the Project Area <br />shall be reduced or diminished in the same proportion as services to South <br />Bend's other customers. <br />D) South Bend agrees to allow the District to connect to existing sanitary <br />sewers owned and operated by South Bend at the connection points <br />described below: <br />1. Proposed connection of 8" to existing 10" VCP Sanitary at the <br />intersection of Briarcliff Lane and Darden Road with an estimated flow of <br />11,470 gpd and peak flow of 45,880 gpd <br />2. Proposed connection of 10" to existing 10" PVC Sanitary at the <br />intersection of Ironwood Rd, 240 ft. North of Crownhill Drive with an <br />estimated flow of 41,540 gpd and a peak flow of 166,160 gpd. <br />The existing 10" pipes increase to 12" following the proposed connection to <br />the Project Area. <br />E) The District has determined there are no industrial users in the Sub -District, <br />therefore the District will not be required to adopt and manage a <br />pretreatment program as set forth in paragraph B.v.l. of the Master <br />Agreement. If an industrial user does request to connect to the system <br />within the Sub -District in the future, the District will comply with the terms <br />of paragraph B.v.1. prior to allowing the industrial user to connect to the <br />system. <br />F) All users not already current water user customers of South Bend will be <br />required to have water and or well -water meters to measure their domestic <br />water usage. Further, the meter shall meet the current specifications of <br />South Bend and include a "remote read" feature. <br />G) South Bend reserves the right to review the District's plans for its initial <br />phase of the System to serve the immediate users and determine and <br />approve the plans as acceptable for connection to South Bend's wastewater <br />collection and treatment system. <br />H) The District will require that the System be designed and constructed <br />pursuant to the Indiana Department of Environmental Management <br />("IDEM") permit issued for the project. <br />3 <br />