My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reject Bids - Commerce Center Architectural Precast Concrete Panels Project No 119-030
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Reject Bids/Quotes/Proposals
>
Reject Bids - Commerce Center Architectural Precast Concrete Panels Project No 119-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:48:52 PM
Creation date
7/9/2019 2:53:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CC. Per the schedule provided, all costs for hot/cold weather work have been accounted for and <br />are included. No additional funds will be provided if this Contractor incurs costs for weather <br />conditions that should have been anticipated at bid time. <br />3. SPECIFIC SCOPE EXCLUSIONS: <br />A. Slab edge firestopping. <br />B. Joint sealants at window openings. <br />C. Grouting of pockets where balconies attached to structure.. <br />D. Limestone and marble inlays located at base of building. <br />4. ARCHITECTURAL PRECAST DESIGN AND PERFORMANCE CRITERIA: <br />A. Drawings: <br />a. Architectural - 5G Studio Miami, LLC 02/14/19 Permit drawings (40 drawings) <br />b. Balcony Schematic Design 04/08/19 drawing (1 drawing) <br />c. Structural — 5G Studio Miami, LLC 02/15/19 100% CD drawings and 03/25/19 <br />Addendum 01 drawings (54 drawings) <br />d. Civil — CEC 11/29/18 Foundation Package drawings, 01/08/19 Core and Shell <br />Permit drawings, and 03/25/19 Addendum 1 drawings (21 drawings) <br />e. Mechanical - 5G Studio Miami, LLC 02/15/19 100% CD drawings (16 drawings) <br />f. Plumbing - 5G Studio Miami, LLC 02/15/19 100% CD drawings (17 drawings) <br />g. Electrical - 5G Studio Miami, LLC 02/15/19 Issued for Permit drawings (16 <br />drawings) <br />B. Specifications: <br />a. American Structurepoint 11/28/18 Foundation Permit <br />b. AEC Specification Consulting LLC 02/14/19 Permit <br />C. Schedule: <br />a. Week of June 171h 2019 - Notice to Proceed <br />b. Embed Delivery Dates:. <br />i. Level 1 Level 1 will utilize post -installed connection <br />plates <br />ii. <br />Level <br />07/10/19 <br />iii. <br />Level <br />07/30/19 <br />iv. <br />Level <br />08/20/19 <br />v. <br />Level <br />09/11/19 <br />vi. <br />Level <br />10/02/19 <br />vii. <br />Level <br />10/23/19 <br />viii. <br />Level <br />11/13/19 <br />ix. <br />Level <br />12/13/19 <br />x. <br />Level10 <br />01/03/20 <br />c. Erection Start —Completion: <br />i. Floors 1-5 12/09/19 — 02/10/20 <br />ii. Floors 6-Roof 02/10/20 — 04/20/20 <br />Commerce Center Mixed Use Development — Architectural Precast Bid Package <br />Appendix A - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.