Laserfiche WebLink
EXHIBIT A TO APPENDIX "D" <br />City of South Bend <br />Western Avenue <br />Inspection Fee Man-hour Justification <br />prepared 06-24-2019 <br />HWC <br />Project Manager <br />0 <br />$155.00 <br />$ <br />Inspection Group Manager <br />75 <br />$115.00 <br />$ <br />8,625.00 <br />Senior Construction Inspector <br />640 <br />$105.00 <br />$ <br />67,200.00 <br />Sr. Const. Inspection (overtime) <br />0 <br />$122.50 <br />$ <br />Construction Inspector <br />240 <br />$95.00 <br />$ <br />22,800.00 <br />Construction Inspector (overtime) <br />0 <br />$109.25 <br />$ <br />- <br />Design Engineer <br />0 <br />$130.00 <br />$ <br />- <br />Senior Landscape Architect <br />0 <br />$135.00 <br />$ <br />Landscape Architect <br />0 <br />$110.00 <br />$ <br />Planner <br />0 <br />$125.00 <br />$ <br />Designer/Technician <br />0 <br />$100.00 <br />$ <br />Project Surveyor <br />0 <br />$120.00 <br />$ <br />Survey Crew Leader <br />0 <br />$100.00 <br />$ <br />- <br />Survey Crew Member <br />0 <br />$80.00 <br />$ <br />Engineering Intern <br />0 <br />$56.00 <br />$ <br />Engineering Intern (overtime) <br />0 <br />$64.65 <br />$ <br />Clerical Support <br />0 <br />$75.00 <br />$ <br />955 <br />$ <br />98,625.00 <br />Total Labor costs $ 98,625.00 <br />Direct Expenses $ 2,200.00 <br />Direct Expense Summa <br />Mileage <br />Weeks <br />Miles/Week <br />Total mileage <br />$0.44/mile <br />Ins ection Manager <br />5 <br />200 <br />1000I <br />$440.00 <br />Construction Inspector <br />16 <br />250 <br />4000 <br />$1,760.00 <br />Senior PM, PM <br />Direct Expenses <br />0 250 0 $0.00 <br />Total $2,200a00 <br />Full time inspection will be required for 21 weeks from approximately June 27, 2019 to November 30, 2019 totaling 840 hours <br />100 hours has been allotted for preconstruction and post construction efforts. <br />An inspector will assist with inspection duties during critical operations and in the beginning of the project for 8 weeks total <br />Inspection manager time for project coordination and inspection fill-in effort. <br />Note: This contract is expected to be fully utilized by October 3, 2019 prior to completion of the construction. <br />Page 3 of 3 <br />South Bend, Indiana <br />Western Avenue <br />Appendix "D" <br />