Laserfiche WebLink
. <br />been liall nainlisl�1 1�ihalve <br />issued, s <br />2,. issue addetide appropriate to , e .. <br />. - ,.. � <br />4. <br />C <br />i . A11=t1 <br />as to ww k cld" nts. <br />i—e <br />5 <br />'"11 --hwe and determine the ay-eeptability of <br />,.., ,. <br />rfep,�- �-- . - Exhibi! A. <br />6. ,544end the Bid opening, .Bid tabulatiaHsheets, .. <br />B.ego.. eeffiffiefleeffielif of' the <br />Phase The <br />-fay <br />ve <br />A 1.05 Construction Phase <br />A. Upon successful completion of the Bidding and Negotiating Phase, and upon written authorization <br />from Owner, Engineer shall: <br />1. General Administration of Construction Contract: Consult with Owner and act as Owner's <br />representative as provided in the Construction Contract. The extent and limitations of the <br />duties, responsibilities, and authority of Engineer as assigned in the Construction Contract <br />shall not be modified, except as Engineer may otherwise agree in writing. All of Owner's <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />