My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Notre Dame Triangle Alley Paving Project No 119-057 - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Notre Dame Triangle Alley Paving Project No 119-057 - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:13:05 PM
Creation date
7/9/2019 2:48:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
lg ;Q <br />INDIANAPOLIS, IN August 7, 2018 <br />TO <br />RIETH RILEY CONSTRUCTION <br />GOSHEN, IN <br />who has filed with the Department a Contractor's Statement of Experience and Financial Condition as <br />required under Indiana Code -2-1 g, is hereby qualified to bid at any Department of Transportation <br />letting in Classes of Work and within the amount and other limitation of each classification as listed <br />below, for such period as the uncompleted work on hand from all sources does not exceed the aggregate <br />amount. Classification references by narne, or symbol are in accordance with the definitions In the <br />Contractor's statement of Experience and Financial Condition. This cedifacate supersedes any certificate <br />previously issued, but is subject to revision or revocation according to the law, if and when changes <br />in the financial condition of the contracting firm or other facts justify such revision or revocation. <br />Valid August 1, 2018 Thni July 31, 2019 <br />AGGREGATE....................................................................................................................................... <br />$UNLIMITED <br />0085 <br />CLEAN/SEAL CRACKS/JOINTS: PCCP/HMA PVNtT.............................................................................. <br />S 10,000,000 <br />0103 <br />3 SIDED BOY STRUCTURES OVER 20 FOOT SPAN ....................... <br />................. _....................................$UNLIMITED <br />0290 <br />SEWER AND PIPE CLEANING AND LNNG............... ..... --................................................................... <br />$10,00Q000 <br />0318 <br />TRAFFIC CONTROL -SNOW AND ICE REMOVAL........................„......................................................... <br />$10,000,000 <br />0390 <br />UNDERSEAL[NG......................................................................................................................................... <br />$10,000.000 <br />A(A) <br />CONCRETE PAVE,1TENT: GENERAL...................................................................................................... <br />$UNLIMITED <br />B(A) <br />ASPHALT PVYIT:W/NDOT CERTIFIED HMA PLANT ............ <br />.................................. ................... ......... SUNLINUTED <br />C(A) <br />HEAVY GRADING..................................................................................................................................... <br />tNLIMITED <br />D(A) <br />HIGHWAY OR RAILROAD BRIDGE OVER WATER .......... ......................................... <br />.......................... SLr LIVi t1TED <br />D(B) <br />HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY ................................... <br />................. .......... .. .... ....$UNLIMITED <br />D(C) <br />HV,Y/RR BRIDGE REQ RR TRACK PROTECTION ................................... <br />................................. ............ $UNLIMITED <br />E(C) <br />BRIDGE DECK OVERLAY. MINOR BRIDGE REPAIR......................................................................... <br />$ IQOOQ000 <br />E(E) <br />SMALL STRUCTURES AND DRAINAGE ITENIS--....................................................................I.......-.. <br />510,000.000 <br />E(F) <br />SURFACE MASONRY AND MISCELLANEOUS CONCRE ............... <br />........................................... . <br />.....•••.$UNLIMITED <br />E(H) <br />DEEP SEINER AND/OR EXCAVATION ............... ................ ........................ <br />..................... ......................SUNLIMITED <br />E(R) <br />ASPHALT PAVEIMENT MILLING ......................................... ..... <br />..._..........._.......................................-....,flTED <br />E(T) <br />DEMOLITION.......•........................................................................................................... <br />..$UNLIMITED <br />PREQUALIFICATION ENGINEER COMMISSIONER <br />State Farm 20508 (R3 / 5-05) <br />
The URL can be used to link to this page
Your browser does not support the video tag.