My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2019 Demolitions Phase I Project No 119-035 - Indiana Earth Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - 2019 Demolitions Phase I Project No 119-035 - Indiana Earth Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:06:27 PM
Creation date
7/9/2019 2:47:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANApM <br />CONTRACTOR:§=QWTE FOROUB C W <br />PROJECT NAME: 2019 Demolitions, Phase I <br />................... <br />PROJECT NO. 119-036 <br />QUOTES DUE July 9, 2019, 9:30am, Local Time <br />(Must be completed for all quotes. Please type or print) <br />Date: Fi <br />rm: <br />Address: <br />City/State/Zip.,.:; Telephone Number: .7 Co _ .., <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The Ci of South Bend, De artment of Public Works <br />and dated J ' a Q J,01 for the sum of (enter the Total Quote as shown on the Proposal) <br />it aI m " d ; �i 7 m W 0. <br />(Enter Sum of Total ote plus Alternates shown on Proposal) , W (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />B <br />Y <br />ignature <br />f CC k <br />C <br />PeOt d Nr ee of P s i, ., i _ <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />Laura L. O'Sullivan, Member <br />Version 4/2/2019 <br />ACCEPTANCE <br />day of <br />Genevieve E. Miller, Member <br />20 <br />Therese J. Dorau, Member <br />........... <br />Attest: Linda M. Martin, Clerk <br />Page - 15 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.