My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Liberty Tower Improvements Div C Project No 118-086R - Environmental Glass Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Liberty Tower Improvements Div C Project No 118-086R - Environmental Glass Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:47:58 PM
Creation date
7/9/2019 2:42:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TUBELF'rE' <br />To: <br />Attention: <br />L. Project: <br />LEADERS W ECO-EFROENTSTOREFRONT Quote No.: <br />CURTAINWALLANOENTRANCESYSTEMS Total: <br />www.ecoluminum.com <br />Fax: <br />Janes 1 2019 <br />:kotA 'T ",ts I ti.14t (>V- <br />w w r r 11 "M O rr'q 11E1Al <br />Please specify if <br />luminum is required <br />YOU MUST REFERENCE THIS QUOTE NUMBER TO RECEIVE THE PRICE SHOWNI <br />DUE TO THE. RECRNT Ft.11�CTUATfN IN BfLLET PRICING„ R IS ORUtAL THAT WE HOLD THE aRICING ON THIS ftUOTATIOtt FOR LAYS ONLY, t'I" NS <br />SUGGESTED THAT THIS IS ALSO TAKEN INTO CONSIDERATION WHEN YOU ARE PROVIDING YOUR BID <br />THIS OttOTATION IS' VALID FOff' THIRTY (30) DAYS fROIA THE OATS Of UNLESS OTHERYttSE NOTEDD ON ONE RELEASE, Ott QUOTATION IS Stl0,7ET TO F'WftWE t:SDALATtON <br />1,Ve appraoato your recent inquiry and are ploased to odfar the tolPoVng prgposa�G for materials onPy as dascrMbed harem;. <br />�tsll'l0 L.� r L��P. •ltttfass nolad, ath�t0 : n..��h9tLsD,�t.9&edldP ,grad w�,�ra¢tr+shlc onPv.. <br />Ttubellte's Alternates / Additions / Deducts / rerak•t uts <br />Deduct 2,064.00 from original quotation price <br />Tubelite to remove door #5 & door 06 from the base quoted price and replace with framing rmaterial. <br />TUbellte Standards Expluslow <br />Shop drawings, labor to fabricate stock lengths, engineering, PE stamp, structural calculations, wind load or dead load anchors, steel reinforcing, glass and glazing. <br />tdGOtle6 <br />NO NFRC CMA product certification: <br />Quotation excludes NFRC CMA Label Certificate. <br />Thermal Modeling <br />Tubelite excludes all thermal modeling required for surface temperatures prediction used for condensation analysis or other design requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.