Laserfiche WebLink
REGULAR MEETING JUNE 25, 2019 180 <br />AWARD BID — ONE (1) OR MORE, 2019 OR NEWER, COMBINATION JET <br />RODDERNACUUM MACHINE WITH CAB AND CHASSIS — SPEC M (SEWER <br />DEPARTMENT CAPITAL) <br />Mr. Jeff Hudak, Central Services, advised the Board that on May 28, 2019, bids were received <br />and opened for the above referenced equipment. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Best Equipment Co., 5550 Poindexter Dr., Indianapolis, Indiana, in the amount of $361,864 for <br />the Base Bid of $399,864 less trade-in of $38,000. Therefore, Ms. Maradik made a motion that <br />the recommendation be accepted, and the bid be awarded, and the contract approved as outlined <br />above. Ms. Dorau seconded the motion, which carried. <br />AWARD BID — TWO (2) MORE OR LESS, 2019 OR NEWER MID -SIZE EXTENDED CAB <br />FOUR WHEEL DRIVE PICKUP TRUCK — SPEC 0 (CODE ENFORCEMENT CAPITAL <br />LEASE) <br />Mr. Jeff Hudak, Central Services, advised the Board that on June 11, 2019, bids were received <br />and opened for the above referenced equipment. After reviewing those bids, Mr. Hudak <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Jordan Ford, 609 E. Jefferson Blvd., Mishawaka, IN 46545 in the total amount of $59,668; <br />$26,499 each plus Alternate Nos. 2 and 4. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted, and the bid be awarded as outlined above. Ms. Dorau seconded the <br />motion, which carried. <br />APPROVAL OF REQUEST TO REJECT BIDS — MUESSEL GROVE PUBLIC RESTROOM — <br />PROJECT NO. 118-099 (VPA CAPITAL) <br />In a memorandum to the Board, Ms. Alicia Czarnecki, Engineering, requested permission to <br />reject all bids for the above referenced project due to exceeding the budget. Therefore, upon a <br />motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above request was <br />approved. <br />AWARD QUOTATION — CODE ENFORCEMENT OFFICE DOOR AND INSTALLATION <br />(CODE ENFORCEMENT/COIT) <br />Mr. Adam Parsons, Central Services, advised the Board that on June 11, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Parsons recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Brown & Brown General Contractors, Inc., 124 S. Elkhart St., PO Box 487, Wakarusa, <br />IN 46573, in the amount of $3,148. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted, and the quotation be awarded as outlined above. Ms. Dorau <br />seconded the motion, which carried. <br />AWARD QUOTATION — HYDRANT FLOW TESTING — PROJECT NO 119-041R (WATER <br />WORKS PROFESSIONAL SERVICES) <br />Mr. Charlotte Brach, Engineering, advised the Board that on June 11, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Brach recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Shambaugh and Son, LP, 5870 Carbonmill Dr., South Bend, IN 46628, in the amount of <br />$37,145. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and the <br />quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 6 — HOWARD PARK REDEVELOPMENT AND ST. <br />LOUIS BLVD. IMPROVEMENTS — PROJECT NO 117-047B (PARK BOND RETIF <br />REGIONAL CITIES GRANT, AND CUMULATIVE CAPITAL) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 6 on behalf <br />of Larson Danielson Construction Company, Inc., 302 Tyler St., LaPorte, Indiana indicating the <br />contract amount be increased by $89,509.43 for a new contract sum, including this Change <br />Order, in the amount of $17,997,438.65. Upon a motion made by Ms. Maradik, seconded by Ms. <br />Dorau and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — THREE TWENTY AT THE CASCADE — SITE <br />UTILITIES, DIVISION B — PROJECT NO 118-047D (RWDA TIF <br />Mr. Gilot advised that Mr. Zach Hurst, Engineering, has submitted Change Order No. 1 on <br />behalf of Ritschard Bros., Inc., 1204 W. Sample St., South Bend, Indiana, indicating the contract <br />amount be increased by $2,063.50 for a new contract sum, including this Change Order, in the <br />