CURB AND SIDEWALK IMPFO VEMENT RESOLUTION NO. 156.
<br />I RESOLVED BY THE BOARD OF PUBLIC WORKS OF THE CITY OF SOUTH BEND ST. JOSEBH
<br />,COUNTY, STATE OF INDIANA, That it is deemed necessary to improve.,Emerick Atreet rrom
<br />,Washington Avenue to Jefferson Boulevard, by removing the old Brick vwalk where they
<br />'are not in gopd condition and constructing- cement sidewalk and cement curb where nee
<br />-dssary, ix aeeordanee -.with the profile, details. , drawings and rpeeifiaations an, file
<br />-in the offi ce of the, bepartment of the Board of Publi c Works of said City ; and such
<br />•iliprovemeiit is now ordered.
<br />The -cost of .said improvement, including the cost of street, and alley inteir
<br />•sections shall be assessed upon. the real estate, abutting on said EMERICK STREET FROM.
<br />4WASHINGTON AVENUE TO JEFFERSON BOULEVARD.: all according to the mmethod' and manner ;pro'-
<br />~vided for in Act of the >General Assembly of the State of Indiana, entitled " An Act
<br />,.-Concerning, Muni eipal Corporations ,.approved March 6, 1905, and in accordance with
<br />and pursuant to,the provisions -of, amendatory and supplemental acts tleret®,pa,ssed
<br />by the General Assembly of the State of Indiana. - Assessment s,if, defferred ,are to b
<br />Abe ;paid in ten equal annual installments with interest at the rate of Six per cent pe
<br />Tper annum. A Bond or bonds shall be issued to the contractor in'payment of such work
<br />'unless the property owners pay said assessment before said Bond or bands are issued.
<br />Under no circumstances shall the City_ of South Bend,be;or 'be held responsible . for any
<br />sum or �cums due from said property owner or 'owners for said work or for the- collectin
<br />-of the came,. or for the payment., of any bond, bonds, certificate or certicates, iesuet%
<br />-to said contractor in payment for such '"cork, exePpt for Fueh moneys as shall;have' ,ben,
<br />been actually received by the City from -the assessments for such improvement, or such
<br />.-moneys as Said City is by said --above entitled Act required to pay. All proceedings
<br />had, and work done ix_ the making` of said improvement, assessment of property, col
<br />ieetion of assessments and issuance of bonds therefor, shall be as provided for in
<br />said above entitled Act and amendments thereto.
<br />Notice. of this resolution shall be published on the 3rd._ day of May 1912 and on the
<br />loth. day of May 1912.' in the 4,outh Bend Daily Times. This BoRrd will- give a hear-
<br />ing on this resolution at its office in the City Hall on t e 14th. day of June `19121,
<br />at 7: 45 P.M.
<br />Adopted this 3Ot h. daV of Ap ri 1,1912. . -
<br />Motion made, seconded 'and carried that the foregoing resolution be unanimously ad.optd
<br />by the Board.'
<br />LOCAL, SEWER IMPROVEMENT RESOLUTION 90. 157.
<br />RESOLVED' BY THE BOARD OF PUBLIC WORKS OF THE CITY OF SOUTH BEND,CDUNTY
<br />OF ST. .JOSEPH, STATE OF INDIANA, That the" construction of a local sewer, intended and
<br />adapted,only for local use by the -property holders whose property abuts thereon, and
<br />not intended; or adapted for receiving sewerage from collateral drains, be anal -thesar
<br />same is,hereby ordered in and -along Studebaker Street from Fassnacht Avenue to Linden
<br />Avenue, vi 2: -
<br />Begirining at the center of F+'assnacht Avenue and Studebaker Street.; thence
<br />south along the center line of said Studebaker Street to a point about I0(i feet north
<br />•o_f the north line of Linden. Avenue with a 12 inch vitrified pipe sewer, together with
<br />the nessgsary mmanholes,inlets and i-.ouse conn.ection.s to the curb line along-thc-lin,e d
<br />of said ir;-provement, and said sewer, with all its appurtenances shal.l'"be constructedfi
<br />in aecordiance with the profile and opecificatioks now on file in the office -of the
<br />Department of Public Works of said City. The cost of said improvement shall bt `app"
<br />tioned against and paid by the property holders whose property abuts thereon, and up-
<br />•ox the City of South Bend if the City is benefited by said improvement, all'acd®rd-
<br />ing to the method and manner provided for in Act of the -General Assembly of the Stab
<br />of Indiana, entitled "An Act Concerning Municipal Corporation;" approved March- 6,
<br />1905. Assessment s,if.deferred, are to be paid in ten. equal annual installments, with
<br />interest at the rate of. six per cent per annum. - A bored or bonds shall Ue issued -to
<br />the contractor is pay+,ent for sueh work,un.less the property owners- pay said Assess-
<br />ments ;before said bond or bonds are issued. Under no circumstances shall the City
<br />of South Bend be or be held responsible for any sum or sums due from said .property
<br />N, owner or owners for said work, or.for the collection of same,or for thepayment of any .
<br />bond or bonds certificate or certificates,issued to said contractor in payment for sh
<br />such work,exeept -for such moneys as shall have been actually received by the City
<br />from the assessments for sueh improvement, or such moneys as said City is by said
<br />above entitled Act required to pay. All proeeedings had, and work done in the mak-
<br />ing of said improvement assessmet of property, collections of assessments and-issuane
<br />of bonds therefor, shall be as provided for in said above entitled Act.
<br />Notice of this resolution shall be published on the 3rd. day of flay and.
<br />on the loth. day of May 1912,in the South Bend Daily Tires. - This Board will give a
<br />hearing on this resolution at its office in the City Hall on the 14th, day of June"
<br />1912 at 7:45 P.M.
<br />Adopted this 30th. day of April 1912.
<br />Met ion .made, seconded and carried that the foregoing Asoluti®x be unsxinously a-
<br />depted by the Board.