Laserfiche WebLink
scat' April then 9th. 1912. Contixued. <br />V To the Hon. Board of PublicWarke, <br />of the City of South Bend,Indiana. <br />Gentlemen: — <br />I respectfully report that L have tabulated the bids submitted on March <br />22nd. 1912 for the paving of Hydraulic Avenue and Find that Harry N. Barnes is. the: <br />lowest and best bidder upon Marion Block Brick laid upon a 5 inch Concrete foundation: <br />I therefore recommend that he be awarded the contract. <br />Respect fully, <br />1►m. S. Moore, <br />Adopted on April 9th. 1912. City Engineer. <br />FINAL .$ESOLUTI ON P <br />DESIGNATING KIND OF PAVEMENT TO BE LAID. a <br />WHEREAS, The Board of Public Works of the City of South Bend India <br />na, did <br />on the 22nd. day of March 1912, enter a preliminary order designating, vitrified brick <br />laid on a concrete foundation, and awarded the Contract to Harry N. Barnes,he being <br />the lowest and best bidder upon Marion Block Brick the same to be laid on Concrete <br />foundation on Hydraulic Avenue from La Salle Avenue to The East Race, there being no <br />petition filed asking for change of material: THEREFORE, <br />BE IT RESOLVED,that the preliminary order is hereby confirmed and the afore <br />said street is hereby ordered paved with vitrified brickjM&rion Block. <br />OTTO. C. BASTIAN <br />F. E. LAMBERT <br />BOARD OF PUBLIC WORKS. <br />CHAS. F. NIEDBALSKI <br />Adopted on the 9th. day of Apri1,1912. <br />✓Hearin.g given on <br />No. 141. <br />the Grade, Curb and Welk on <br />Corby Street, Improvement Resolution. <br />Oral remonstrators appeared but no written remonstrances were filed. <br />this matter the Board deferred the hearing until April <br />In th <br />the 23rd. 1912 at 10:00 <br />A.M. <br />✓Hearing given on <br />'a <br />Pipe Sewer on. Olive Street, <br />under Improvement Resolution No. <br />142. <br />In this matter <br />the <br />renos+htrance was filed. The <br />Board deferred the hearing until <br />April <br />23rd. 1912 at <br />10:00 A.M. <br />v/ Hearing on Niles Avenue Grade , Curb and Walk, iuntle r Improvement Resolution No... 139 <br />In this matter _a remonstrance was filed. The Board deferred the hearing until April <br />the 23rd. 1912 at 10:00 A.M. <br />✓ Hearing given on the lst. alley, East of High Street from Milton Avenue to Dayton <br />Street under improvement Resolution No. -140 for Grade. Oral remonstrance. was made <br />but no written remo.s-tr:�«ce was filed. The Board deferred the hearing until ril <br />the 23rd. 1912 at 10:00 A M. Ap <br />Board instructed the Clerk to noti the Ind. <br />breaks made in street pavements by them or under Mtheir Esupervision lectric Co. tduting tho repair e year <br />of 1911. y <br />/Postal Telegrapg Cable Company petitioned the Board of Pu:.lic Works for the pxj vile►ge <br />of extending its conduit system on Washington St reet and William Street . as � shown - on : <br />Blue Print attached to Petition.. Same referred to the City Engineer. <br />President. <br />