Laserfiche WebLink
Friday Februery 23rd. , 10,12. <br />Board met in regular cession at 10:00 A. M. All member: present. <br />v Poard granted H. L. Hi-ckey contractor , an e.xuension of time of Thirty (f0) rays <br />on builcin, permit 3446 for the construction of a two story frame building at 315 <br />Vistula Avenue, the same to expire March tl e 24th•. 1912. <br />rl.e£L2'1n p given on the Boorman Creek Condemnatio Resoletion No. 13- on Whi ch all <br />actl0n was deferred until Friday larch the lst. 1912 at 10:00 A.k. <br />,/ Hearing given on the High Street Condemnation Resolution Pfo. 12. on Which all <br />action wi.1s deferred. until :Friday March the lst. 1912 at 10:00 A."al. <br />Rer)lat of the South Bend & nary Land Company, s Platt of the City of Sc;uth Bend, Ind. <br />presented to the Boars: by F.C. Raff, the same was approved. <br />.,t-Petition received by the Board asking for a number of loads of grc,vel to be placed <br />on Campeu Street from North Eddy Street to Arthur Street. The same was referred to <br />the City Enginc er fare investigation <br />President. <br />