Laserfiche WebLink
STEVENSON MILL <br />January 13, 2019 <br />Revised January30, 2019 <br />Page 2 of 9 <br />Residents have complained about vibrations occurring in the building as a result of <br />construction activity next -door. This vibration was most noticeable on the upper floors <br />but the majority of the damage was found on the lower floors. This is where the <br />stresses would have been the greatest. <br />Keller Engineering performed an inspection of the interior of the hallways, a sampling of <br />the apartments and an exterior inspection. Photographs were taken of areas of concern <br />throughout the building. <br />The most obvious <br />damage was found in <br />the drywall on the <br />hallways on the lower <br />levels. Multiple cracks <br />were found in the drywall <br />between the upper <br />corners of doorways and <br />the overhead beams. <br />The cracks tended to <br />follow the seams <br />between drywall panels <br />and typically followed a <br />stair step pattern. It was <br />difficult to focus a <br />camera on the cracks, <br />but here is a sampling. <br />Keller Engineering, Inc. <br />54365 30`" Street • South Bend, Indiana 46635 • P: (574) 272-3525 • F: (574) 247-6006 <br />www.KellerEnginecring[no.com <br />