General Administration of Construction Contract: Consult with Owner and act as Owner's <br />representative as provided in the Construction Contract. The extent and limitations of the <br />duties, responsibilities, and authority of Engineer as assigned in the Construction Contract <br />shall not be modified, except as Engineer may otherwise agree in writing. All of Owner's <br />instructions to Contractor will be issued through Engineer, which shall have authority to act <br />on behalf of Owner in dealings with Contractor to the extent provided in this Agreement <br />and the Construction Contract except as otherwise provided in writing. <br />2. Pre -Construction Conference: Participate in a Pre -Construction Conference prior to <br />commencement of Work at the Site. <br />3. Schedules: Receive, review, and determine the acceptability of any and all schedules that <br />Contractor is required to submit to Engineer, including the Progress Schedule, Schedule of <br />Submittals, and Schedule of Values. <br />4. Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for <br />locating the Work which in Engineer's judgment are necessary to enable Contractor to <br />proceed. <br />5. Clarifications and Interpretations; Field Orders: Issue necessary clarifications and <br />interpretations of the Contract Documents as appropriate to the orderly completion of <br />Contractor's work. Such clarifications and interpretations will be consistent with the intent <br />of and reasonably inferable from the Contract Documents. Subject to any limitations in the <br />Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />6. Change Orders and Work Change Directives: Recommend change orders and work change <br />directives to Owner, as appropriate, and prepare change orders and work change directives <br />as required. <br />7. Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. Engineer shall meet any Contractor's <br />submittal schedule that Engineer has accepted. <br />8. Substitutes and "or -equal": Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />9. Disagreements between Owner and Contractor: Render formal written decisions on all <br />duly submitted issues relating to the acceptability of Contractor's work or the interpretation <br />of the requirements of the Contract Documents pertaining to the execution, performance, or <br />progress of Contractor's Work; review each duly submitted Claim by Owner or Contractor, <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />