Laserfiche WebLink
This is EXHIBIT A, consisting of 8 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 17, 2019. <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1— BASIC SERVICES <br />A1.01 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />Design d vt lcafament dra i:l�grrJ7a l a e outline specifications, construction cot revisions, <br />preliminary finish selections mid bo? d, 3D model with im4ges. <br />6. Furnish 3 review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within 30 calendar days of authorization to proceed with this <br />phase, and review them with Owner. Within 5 calendar days of receipt, Owner shall <br />submit to Engineer any comments regarding the Preliminary Design Phase documents and <br />any other deliverables. <br />7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner's comments, as appropriate, and furnish to Owner 3 copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within 5 calendar days after receipt of Owner's comments. <br />Page 1 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />