Laserfiche WebLink
o A successful investigation of a flagged meter for meter under - <br />registration is defined as a bench test or onsite field test that measures <br />registration at low, medium, and high flows per AWWA M6 standards. <br />Section IV. Forecasted Work Plan & Project Team <br />Suggested Start Date Jelly l „ 0 �.9. Detailed work plan and project team in <br />attachment B <br />Section V. Phase 1 Transition <br />A successful Phase 1 outcome occurs when the total revenue discrepancy associated <br />with the correct flags identified is greater than the cost of service. Once Phase 1 <br />success is validated, the transition to Phase 2 and all of Customer Metering <br />Inaccuracies indicators on an ongoing basis will be planned. <br />9.01 Additional Terms <br />A. Owner that all intellectual property rights used by Engineer in the performance of its <br />services to the Owner are owned by Engineer. The Owner is permitted to use those <br />rights to benefit from the services. <br />B. Engineer acknowledges that the Owner is the owner of the data provided to Engineer. <br />The Owner permits Engineer to use the data to provide the services, analyze and improve <br />its services or for other internal purposes. <br />C. The Owner and Engineer will keep confidential all documentation and information <br />provided by the other during the performance of the services. <br />D. Engineer is not responsible for the decisions made by the Owner based on the services <br />provided by Engineer. <br />EJCDC E-520 Short Form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright ©2009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Paee 7 <br />