My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Erskine Clubhouse Basement Flooring - Carpet Service Outlet Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - Erskine Clubhouse Basement Flooring - Carpet Service Outlet Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:00:53 PM
Creation date
6/25/2019 3:15:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(ii) Minimum Grade III <br />(iii) Size is 12X24 <br />(iv) Color to be selected by City staff. <br />c. Installation <br />(i) Modified thinset mortar using minimum 3/8" inch notched trowel <br />(ii) Tile must be installed level <br />(iii) Tile must be installed using'/4" the spacers and spacing must be consistent throughout <br />(iv) Cut edges shall be smoothed with appropriate tile file <br />d. Grout <br />(i) Epoxy grout — Color to be submitted for approval <br />(ii) Contractor will install epoxy grout to manufacturer recommendations including the using of <br />grout release if necessary <br />(iii) Contractor will ensure cleaning of grout residue off tile and the full removal of all <br />efflorescence. <br />4. Contractor will submit samples of product for approval by City personnel prior to procurement and <br />installation of the flooring. <br />B. Installation notes: <br />1. All flooring must be installed by qualified personnel to follow manufacturer specifications and <br />industry best practices. <br />2. Installation must meet requirements of product warranties and the warranties must be serviceable <br />by the Contractor. <br />3. Flooring shall be adequately prepped for installation to include floating using levelling compound <br />and removal of high spots where required. <br />4. Contractor will not disturb areas of floor that are painted as paint is assumed to be lead -based. <br />Areas may be encapsulated by appropriate leveler. <br />5. Contractor will install owner supplied cove base throughout where appropriate. <br />C. Contractor site visit <br />1. Contractor must schedule a site visit to properly quote the work. Please contact Patrick Sherman <br />at f1.I'n � rm�'...I,goy or 574-235-5601 to schedule by 06/20/2019. <br />��a�r��ri�a�°�q� ���u��h ��...°...,. <br />Version 1/17/2019 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.