My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Market Contract - Klink Trucking Inc - 2019 Street and Sewer Dept Materials
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Open Market Contract - Klink Trucking Inc - 2019 Street and Sewer Dept Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:56:48 PM
Creation date
6/25/2019 3:12:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. Damages are progressive for each specific mix design. The material costs for the <br />day the sample was taken will be reduced by the following percentages <br />First test failure — 10% reduction of actual material cost. <br />Second test failure — 20% reduction of actual material cost. <br />i'i. Third test failure — 30% reduction of actual material cost. <br />iv. Fourth and all successive test failures — 50% of reduction of actual <br />material cost. <br />5. The City of South Bend reserves the right to accelerate the corrective action/damages <br />procedure or to require the contractor, at his expense, to remove and replace the material <br />in the event the failure in the material delivered may cause physical or property damage to <br />the public. <br />6. The parties recognize that time is of the essence in regard to this Contract and that City will <br />suffer financial loss if the equipment, supplies, services are not delivered within the times <br />specified on the Contract. <br />a. It is agreed between the parties hereto that if Contractor shall not deliver the <br />equipment, supplies, services and/or other obligations by the date specified in <br />the Contract, City shall use the bid bond or certified check of bidder as liquidated <br />damages <br />b. Should the Contractor fail to provide or perform the equipment, supplies, services <br />and/or other obligations pursuant to the Contract, and should the City then elect <br />to bid a new project that will replace the Contract, any bid for the project from <br />Contractor will be considered only if Contractor can demonstrate the ability to <br />deliver and perform the equipment, supplies, services and/or other obligations in <br />a timely fashion. <br />c. It is agreed between the parties hereto that if Contractor shall not deliver the <br />equipment, supplies, services and/or other obligations by the time specified in the <br />Contract, City shall award all or part of the material to the next lowest bidder. <br />VII. DELIVERY <br />A. Prevailing specifications/INDOT Standard Specification Section: None <br />B. Additions: <br />1. All items shown in the specifications shall be delivered to the Bureau of Streets at 731 <br />South Lafayette or to other sites within the City of South Bend designated by the City's <br />representative ordering the material. Delivery dates shall include weekends and holidays <br />as designated by the representative ordering the material. <br />2. Each load of loose materials must be fully tarped or covered from origin to the point of <br />delivery to minimize loss from blowing and change of moisture content. <br />3. Duplicate weight tickets will be provided for each load. Each ticket will bear a serial <br />number, increasing in number with each load. No ticket number shall ever repeat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.