My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interlocal Cooperative Agreement - INDOT - Cleveland Road Brick Road Pavement Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Interlocal Cooperative Agreement - INDOT - Cleveland Road Brick Road Pavement Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:48:35 PM
Creation date
6/25/2019 3:11:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction Costs <br />May, 2019 <br />Intersection Improvement For US 31 @ Brick/Cleveland Rd <br />South Bend, Indiana <br />Based on Measured Quantities of Preliminary Design <br />Brick/Cleveland Rd <br />Item No. <br />Description Assume (%) Quantity Unit Unit Cost Extension <br />1 <br />Constriction Engineering <br />1 <br />l <br />LSUM <br />$ 10,200.00 <br />$ 10,200 <br />2 <br />3 <br />Mob/Demob <br />Clearinn ROW <br />3 <br />1 <br />1 <br />I <br />LSUM <br />t.il fM <br />S 30,600.00 <br />k 1 n_7nn nn <br />$ 30,600 <br />R I n Inn <br />4 <br />5 <br />Temporary Erosion Control <br />Common Excavation <br />1 <br />1 <br />6656 <br />LSUM <br />CYS <br />S 10,200.00 <br />$ 20.00 <br />$ 10,200 <br />$ 133,111 <br />8 <br />6 <br />Pavement Removal <br />Subgrade Treatment Type 11 <br />10,256 <br />19,967 <br />SYS <br />SYS <br />$ 15.50 <br />$ 15.00 <br />$ 158,973 <br />$ 299,500 <br />T <br />8 <br />Com acted Aggregate No 53 <br />PCCP 10" <br />3,419 <br />10.256 <br />TON <br />SYS <br />$ 25.00 <br />$ 55.00 <br />$ 85,469 <br />$ 564,097 <br />9 <br />165 Ib/S d, QC/QA-HMA, 2, 64, Surface , 12.5 min <br />330 <br />TON <br />$ 80.00 <br />$ 26,437 <br />10 <br />275 Ib/s d, QC/QA-HMA, 2, 64, Intermediate , 19.0 imn <br />551 <br />TON <br />$ 70.00 <br />$ 38,554 <br />l 1 <br />jAsphalt for Tack Coat <br />l <br />TON <br />$ 500.00 <br />$ 500 <br />12 <br />Construction Sig A <br />10 <br />EA <br />$ 140.00 <br />$ 1,400 <br />13 <br />lBarricade III -A <br />100 <br />LFT <br />$ 15.00 <br />$ 1,500 <br />14 <br />Barricade III-B <br />100 <br />LFT <br />$ 15.00 <br />$ 1,500 <br />15 <br />Maintaining Traffic <br />2.5 <br />1 <br />LSUM <br />$ 25,500.00 <br />1 $ 25,500 <br />ubtotal $ 1,397,74( <br />.ontin ency 20% $ 279,54f <br />'otal $ 1,677 30( <br />\\ttg-srv\Projects\projects\PS\INDOT\18115-00 US31 Pvmt Des 1383328\Project-Info\Estimate\Cost Estimate for 115-01.xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.