My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Three Twenty at the Cascade Site Utilities Proj No 118-074D - Ritschard Bros Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Three Twenty at the Cascade Site Utilities Proj No 118-074D - Ritschard Bros Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:50:12 PM
Creation date
6/25/2019 3:05:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 1 -074D (Div U') Project Name: Three Twenty at ft Cascade Site Uhli ses (Div B) Change Order #: � <br />DATE INITIATED: 6-13-19 <br />BPW DATE: 6-25-19 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Added work includes unforeseen conditions. A section of abandoned watermain needed to be <br />removed for the sewer lateral as well as two old foundation walls that were in the path of the sewer <br />lateral. <br />Attachments: (List documents support change — required) <br />Price breakdown <br />Amount of BIncrease / ❑ Decrease: $ 2, 063.50 <br />................................ <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0.00 <br />❑ Scope of Work <br />____..... <br />4'01 <br />B Differing Site Conditions, Changed Conditions <br />Current Percent of Change: % <br />❑ Conflicted Specifications and Drawings <br />New Total A__ .............. <br />53 487.00 <br />Amount: $ ' <br />� ❑Failed Materials <br />❑ Error <br />4.0 1 <br />❑Omission <br />Total Percent of Change: <br />❑ Final Quantity Adjustment <br />Funding Secured From: <br />E <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones <br />.f .: (�._ 3 - / <br />Project Inspector (Print Name) <br />(Signature) _ (Date) <br />REVIEWED BY: <br />` <br />Toy Villa <br />.......... _.......- �._ <br />Construction Manager (Print Name) <br />(Signature) (Date) <br />APPROVED BY: <br />Zach Hurst <br />Engineering Project Manager (Print Name) <br />(Signature) (Date) <br />APPROVED BY: <br />Kara Boyles <br />w .,,+ <br />City Engineer (Print Name) <br />(Signature (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.