My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - East Bank Sinkhole Repairs Proj No 118-305A - Northern Indiana Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - East Bank Sinkhole Repairs Proj No 118-305A - Northern Indiana Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:16:02 AM
Creation date
6/25/2019 3:04:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 23, 2019 <br />Mr. Josh Ehmer <br />City of South Bend — Dept. of Public Works <br />Division of Engineering <br />227 West Jefferson Street <br />South Bend, Indiana 46601 <br />RE: East Bank Trail - Sink Hole Repair <br />Mr. Ehmer; <br />As requested I have priced the filling of the existing raceway with a non -removable flowable fill. I <br />have two work items, the first to include the removal of the roof (top) slab of the raceway and the <br />second work item to pump the majority of the water out of the raceway, place concrete shuts, and to <br />furnish and place the flowable fill within the raceway. The removal of the top slab was included in the <br />bulkhead work item. Also, I did not include the cost for a concrete pump, as I believe with concrete <br />shuts and two separate pours we will fill the entire vault. Please see my proposed additional work <br />items. <br />• REMOVE ROOF SLAB OF EXISTING RACEWAY FOR ACCESS <br />LSUM @ $1,970.00 / LSUM = $1,970.00 <br />• DEWATER RACEWAY, INSTALL SHUTES, FURNISH AND PLACE NON -REMOVABLE FLOWABLE FILL <br />145 CYS @ $180.00/ CYS. _ $26,100.00 ( The calculated volume is shown on the attach sheet) <br />As discussed at our meeting the cost of the flowable fill item could be split with the adjacent property <br />owner. Please have your team follow up with Tom Hall with Tuesley, Hall, Konopa LLP. Please approve <br />the proposed method to fill the existing raceway so we can continue work on this project. <br />Respe( tfmally Submitted; <br />David Walor <br />
The URL can be used to link to this page
Your browser does not support the video tag.