My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Colfax Water Works Building Repainting Proj No 118-055 - Facelift Painting and Powerwashing
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Colfax Water Works Building Repainting Proj No 118-055 - Facelift Painting and Powerwashing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:15:47 AM
Creation date
6/25/2019 3:03:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/25/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,y�MN'NC+W <br />�DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 118-055 Project Name: Colfax Water Works Building Repainting Change Order #: � <br />[DATE INITIATED: 6/6/19 BPW DATE. <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.),. <br />-Added Contract Days Due to Weather. <br />Attachments: (List documents support change — required) <br />-March, April, & May Climate Data. <br />........... <br />Amount of ❑ Increase / ❑ Decrease: $, 0., <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0 ❑ Scope of Work <br />❑ Differing Site Conditions, Changed Conditions <br />Current Percent of Change: % ❑ Conflicted Specifications and Drawings <br />❑ Failed Materials <br />New Total Amount: $ 9153.85 <br />__...----------------- ❑Error <br />El Omission <br />Total Percent of Change: ......... ................ ___ % ❑ Final Quantity Adjustment <br />Funding Secured From; IT�ITITIT <br />0 <br />(filled out by PM) <br />RECOMMENDED BY: <br />Josh Ehmer"6/18/19 <br />Project Inspector (Print Name) (Signatu (Date) <br />REVIEWED BY: <br />........... _.................. <br />Construction Ma ger (Print Name) (Signature)CJ (Date) <br />APPROVED BY: , <br />Engineering Project Ma ger (Print Name) (s gan<ature) - (Date) <br />APPRo�ED BY: <br />-" <br />City Engineer (Print Name) (Signature) (tea A-) <br />
The URL can be used to link to this page
Your browser does not support the video tag.