My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/28/1911 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1911
>
07/28/1911 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:06:02 PM
Creation date
6/13/2019 2:41:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/28/1911
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
194 <br />Board met in regular session at 10 A.M. Mr. NI.edbalski absent. <br />✓Street Commissioner reported on the following defective walks South west corner of <br />Emeriek Street and Madison street; 915 West Perkins street:North East corner of <br />Fellow and Bronson street. <br />The foregoing walks ordered replaced under Improvement Resolution No. 54.and the <br />Clerk ordered to notify property holders of same. <br />✓ Street Commissioner reports the following wCk6ks in a dirty condition Lt the Nobth <br />West corner of Niles Avenue and Howard Street also Lot 19 of Stanfields & Fosters Ado <br />on Howard Street. <br />The foregoing walks ordered cleaned and the expense charged to the Property owners <br />. <br />the Clerk ordered to notify property owners by,mail that they would be glowed.tPA.1V <br />days to do the same if not complied with the City would clean and charge to property. <br />✓ Exc,--.,.vation Bond of the Michigan Electric Company.receivwd and approved. <br />Bond a:idContract given by the Indiana & Michigan Electric Compan.y.as principals, <br />and the Maryland Casualty company as surity,approved by the Board. <br />Resolved.by the Board of Public Work-, of the City of South Bend.Indiana.That <br />permission be hereby granted to the Indiana & Michigan Electric Co. to construct an <br />intake and discharge pipe line in Colfax Avenue from the east Bank of the St,Joseph <br />river to said Company's power house,whieh is located at the north east corner of <br />Bridge street and Colfax aveme.said permission s,-Lall be subject to the following <br />conditions; <br />The loeation of said intake and discharge pipes shall be along lines to be <br />established by the City Civil Engineer. The Indiana & jaichigan Electric Co. small att <br />their expense construct a new c&ncrete wing wall and protect the abuttment at the <br />South east corner of the Colfax Avenue Bridge. The aforesaid company shall construct <br />a ten inch Vitrified pipe sewer from the St,Joseph river to tj-;e west line of lot 6. <br />in MackAs Sub -Division for Viie benefit of the City and abutting property owners. <br />The line and grade to be given by the City Engineer. The afoersaid company shall <br />relay in a satisfactory manner IL11 pavements, cement sidewalks and curbing taken up <br />and shall file a Bond in the sum of $1,000.00 Food for a period of one year from the <br />completion of said work.to guarantee the repaving and repairing of any defective work <br />which may develop Mithin sueh specified time. All of the above work shall be done <br />at the risk of the said Indiana & Michi-;an electric Co. and they shall assume the <br />responsibility and risk of damages to the work or to t.;-.e property on said line of <br />work which s.all result from floods.backwater,caving of the street.settling of <br />foundation of bridge or other causes whatsoever connect6d-with the construction of sa <br />said work. The Board of Publie Works reserves the right to &point an Inspector.)who <br />shall be on the work during the construction of the wing wall and t.'Lie relaying of the <br />pavement )sirlewalk and curbing to see that said walk is constructed in a propermanner <br />The aforesaid Company shall pay to the City of South Bend.the sum of $3.00 per day <br />for each day said Inspectoe is required. Said inspector shall be under the direetiona <br />of the City Engineer,,wtlo shall have power to stop the work if Fame is not being <br />properly done.or if t.rje material being lised is not of aproved quality or for any <br />other good and sufficient cause. The time of completion of said work shall be 60 days <br />from the date of the starting.The time of completion is an essential element and the <br />sum of 050.00 per day s-.-Iall be paid the City of South Bend.for every day over the 60 <br />days that the street is closed to traffie,which supris agreed is the liquidat6dr, <br />damages w ich the said City will sustain each day by reason of such delay. All work <br />of replacing the pavementwalkscurbing and construction of wing wall shall be under <br />the supervision of the City Engineer acting under the direction of the Board of Publd! <br />Works,and all work shall be according to the plans and specifications on file in the <br />office of said Engineer.. The I-ndiana & Michigan Electric company shall pay any and <br />all'judgments.)anOT other liabilites which may be rendered against or suffered by said <br />Cityand shall save the City �iarmless from every cause whatsoeverwhich may come <br />against or upon it by reason of the proposed work of said company hereby permitted <br />whether done or caused to be done by said company's a--ents.officers.Sub-Contractors <br />or employeesor any work connected with or relating thereto and said company s'all, <br />file a satisfactory bond to trie sum of 910,,000.00 conditioned for the faithful <br />preformance of its said work and the saving of said (1iyt harmless from every kind <br />of, liability as above stated, <br />Adopted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.