Laserfiche WebLink
Roar? rc±ey in regular session at 10 A.M. all members present <br />✓ The pavement on Maple Street Improvement Resolution No.66. was awarded to <br />C. TH. Defrees the same to be constructed of Metropolitan Block. <br />,/Bids were opened on Lindsey Street Pipe Sewer contractand refered to the City <br />Engineer for tabulation. <br />Petition received and read asking for curb and trV€ilk on South Michi n-an. Street <br />fron Ewing Avenue to a proposed road in the Partridge Ad.d.itio. refered to the City <br />Engineer for specifications. <br />Petition for a pipe sewer on Bibdsell Street from Fassanacht Airen a to Linden St. <br />refered to the City Engineer.for specifications <br />Indiana, and Michigan Electric Co submitted revis?ed plains for the side track across <br />s <br />East Lab, Salle Avenue the sge were approved. <br />P;".The Board ordered the removal of the Central Union Telephone Pole in front of the <br />City9s Fire Hydran on Leer St -at # 1735. Also approved of the aforesaid company's. <br />setting poles as follows; J-40ft.pole out -side of Curb line on North side of Marion <br />St. between Scott and Leland .ave. Also -1-10ft. A:nhor i_,_, the alley between Michigan <br />Ave.and Madison St. at second pole East cif L+e1ia`Ad1:'Av6.ie. Replacing one Anchor of the <br />Indianan Michigan Eleetrie Co. on the East side of Leland Ave.between Michigan Ave. <br />and the first alley- north. <br />IMPROVEMENT RESOLUTION NO.96. <br />Resolved,by the board of Public Works of the City of South Bend Indiana, That it is <br />desired and deemed necessary to snake the following described public improvements in the <br />aforesaid City a's authorized by the following numbered Improvement Resolution adopted <br />by said Board on the 5th. day of July 1911. <br />Resolved that an improvement be made of the kind,Size,loea,.tion and terminal points <br />ac follows: Improve Indiana Avenue from Fain Street to Franklin St. by constructins <br />a lateral sewer as follows: Begin at the center of Main Street;thence dent along the <br />center line of Indiana Avenue to the center of Franklin street with a 15 inch pipe sewe <br />Together with the house connections to the curb line along the line of said improvement <br />Samd Improvement shall be known and designated as LATERAL SEWER TMPROVEMENT ITN <br />INDIANA AVENUE FROM MAIM STREET TO FRANKLIN STREET 11APROVEMENT RESOLUTION NO.96. <br />Said Board has fixed the 28th. day of - july 1911 as a date upon which remonstrances <br />may be filed or heard by persons interested or affected by said public improvement ands <br />on said day at 7-15 P.M. said Board. willat at its said office hear anal. consider any <br />remonstrators and persons interested or whose property is affected by said public <br />ir.,;provement and will deeide whether the benefits that will accrue to tle property, <br />abutting and adjacent to the p ^oposed improvements a. d to said City,i►ill be equal to,or <br />exceed t le estimate cost of the proposed improvements,as estimated by the CityCivil <br />Engineer. A Bond or Bonds to be issued to the contractor in payment of such work where <br />the property owner signet weaver required,as; according to law. Which said bonds shall <br />bear interest at the rate of six per. cent per. 2A..-inum payable as provided by law. <br />Notice of this resolution shall be published on the llth day of my and on the lFtla <br />day of July in the South Bend Daily Tines. <br />President <br />