My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Muessel Grove Public Restroom Renovation Project No 118-099 - Michiana Contracting Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Muessel Grove Public Restroom Renovation Project No 118-099 - Michiana Contracting Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:15:25 AM
Creation date
6/11/2019 2:03:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/11/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Indiana/Kentucky <br />Chapter <br />~���~��"����U��������� ������������� <br />Training Program <br />Between ABC nf IMd'0na/KentUckwand <br />M^ch^anaContracting, Inc. <br />June,2m8 <br />Rationale <br />Since MichianaContracting, Inc. is located inPlymouth, |Nfar Frmmany ABC training center, <br />Michiana Contracting will implement an in-house Electrical apprenticeship training program under <br />the sponsorship of ABC Indiana/Kentucky, A training partnership between Associated Builders and <br />Contractors of Indiaria/Kentucky (ABC) and Michiana Contracting is of great value to both <br />organizations by combining efforts to improve the construction industry through professionally <br />trained craft professionals, TNswr|ttenagoeementdarifiestheagreementbetweenABCand <br />Michiana Contracting to provide an in-house apprenticeship training program located at Michiana <br />Contracting, |nc°7843Lilac Road, P.O.Box 929,Plymouth, Indiana 4GSG3, <br />This Training Ptog ram Agreernentbe"ween ABC and M:chiana Conti -acting is effective beginning <br />August 2oa.8 and will be reevaluated in AuquSt 2019. <br />Both organizations understand the necessity uFsubmitting paperwork inatknek/manner <br />and commit to meeting established submission timelines. <br />M provide classroom and lab space, equipment, and training materials that adequately support <br />implementation and contnvaUonofthe electrical apprenticeship training program; <br />~ pay salaries for in-house program instmcmr(s)/ <br />= ensure apprentices will attend class for no less Lhan 144 hours per level of study as required by <br />theQOL. <br />9 submit to the training site coordinator the following required program documents in the <br />following manner: ` <br />gpi.adl� enrollment forms, peifor'mancepnofiieshcets,employer mandated work forms, <br />HPPbp901t: log attendance weekly in Fla5hpoint, enter grades, OJT submission and approval <br />Ma <br />&atUheendof the semester please sobm|tNCCERmodule exams and Formzou <br />" assure all rules and regulations are Followed per ABC, NCCER, and the US. Departi-rient of Labor <br />
The URL can be used to link to this page
Your browser does not support the video tag.