BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Gemini Site Improvements��
<br />Project Number: 119-043Qf I'll
<br />;'
<br />For Bids Due: June 11, 2019 "
<br />e.
<br />Contractor Name; Walsh & Kelly, Inc.
<br />186E
<br />33
<br />Galvanized Handrailing, 1-3/8", O.D.
<br />14
<br />LF
<br />150.00
<br />$2,100.00
<br />34
<br />Galvanized Safety Railing, 1-3/8" O.D.,
<br />12
<br />LF
<br />160.00
<br />$1,920.00
<br />35
<br />Wood Screen Fence, Wood Frame, 5' Ht.
<br />347
<br />LF
<br />35.00
<br />$12,145.00
<br />36
<br />Wood Screen Fence, Galvanized Frame, 5' Ht.
<br />48
<br />LF
<br />85.00
<br />$4,080.00
<br />37
<br />Wood Screen Gate, Galvanized Frame, 21' Wide x
<br />1
<br />LS
<br />3,800.00
<br />$3,800.00
<br />5' Ht.
<br />38
<br />Ornamental Steel Fence, 5' Ht.
<br />8
<br />LF
<br />85.00
<br />$680.00
<br />39
<br />Ornamental Swing Gate, Self -closing, 3' Wide, 5' Ht.
<br />2
<br />EA
<br />1,850.00
<br />$3,700.00
<br />40
<br />Bike Loops, 36"x22", Surface Mount
<br />3
<br />EA
<br />1,900.00
<br />$5,700.00
<br />41
<br />Mailbox, Multi -tenant, Surface Mount
<br />4
<br />EA
<br />3,300.00
<br />$13,200.00
<br />42
<br />Drywell, 8'Wx6'D with Frame and Grate
<br />4
<br />EA
<br />8,100.00
<br />$32,400.00
<br />43
<br />Casting, Adjust to Grade
<br />2
<br />EA
<br />1,700.00
<br />$3,400.00
<br />44
<br />PVC In -Line Drain, 18"
<br />2
<br />EA
<br />4,900.00
<br />$9,800.00
<br />45
<br />Catch Basin, 48"
<br />1
<br />EA
<br />4,700.00
<br />$4,700.00
<br />46
<br />Floor Drain, 8"
<br />1
<br />EA
<br />4,400.00
<br />$4,400.00
<br />47
<br />Storm Sewer, 12" Perforated in Wrapped Gravel
<br />320
<br />LF
<br />90.00
<br />$28,800.00
<br />Trench
<br />48
<br />Storm Sewer, 12" Solid
<br />60
<br />LF
<br />110.00
<br />$6,600.00
<br />49
<br />Storm Sewer, 6" Perforated in Wrapped Gravel
<br />Trench
<br />55
<br />LF
<br />80.00
<br />$4,400.00
<br />50
<br />IStorm Sewer, 6" Solid
<br />145
<br />LF
<br />140.00
<br />$20,300.00
<br />51
<br />Downspout Connection Boot
<br />7
<br />EA
<br />2,700.00
<br />$18,900.00
<br />52
<br />Geotextile Separation, Stormwater Reservoir
<br />1,045
<br />SY
<br />11.00
<br />$11,495.00
<br />53
<br />Stormwater Reservoir, #8 Gravel, Washed
<br />1,970
<br />TON
<br />45.00
<br />$88,650.00
<br />54
<br />Disconnect Existing Fuse Panel, Remove
<br />1
<br />EA
<br />950.00
<br />$950.00
<br />55
<br />100A Panel, 120/240V, Utility Feeder and
<br />Terminations
<br />1
<br />EA
<br />3,200.00
<br />$3,200.00
<br />56
<br />2" PVC Conduit and Fittings
<br />335
<br />LF
<br />9.00
<br />$3,015.00
<br />57
<br />4" PVC Conduit Sleeve
<br />48
<br />LF
<br />18.00
<br />$864.00
<br />58
<br />2#12, 1#12G Conductor
<br />315
<br />LF
<br />4.00
<br />$1,260.00
<br />59
<br />Handhole
<br />3
<br />EA
<br />1,500.00
<br />$4,500.00
<br />60
<br />IConcrete Light Pole Base
<br />2
<br />EA
<br />950.00
<br />$1,900.00
<br />61
<br />Light Pole, 4" Square, 18'
<br />2
<br />EA
<br />1,700.00
<br />$3,400.00
<br />62
<br />Light Fixture
<br />4
<br />EA
<br />1,750.00
<br />$7,000.00
<br />63
<br />Deciduous Tree, Sun Valley Red Maple, 2.5"cal.
<br />5
<br />EA
<br />603.75
<br />$3,018.75
<br />
|