Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Gemini Site Im <br />Project Number: 119-043 <br />For Bids Due: June 11 2019 <br />Contractor Name: Rieth-Riley Construction Co. Inc. <br />BASE BID <br />..Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />57 <br />4" PVC Conduit Sleeve <br />48 <br />LF <br />18.00 <br />$864.00 <br />58 <br />2#12, 1#12G Conductor <br />315 <br />LF <br />4.00 <br />$1,260.00 <br />59 <br />Handhole <br />3 <br />EA <br />1,500.00 <br />$4,500.00 <br />60 <br />Concrete Light Pole Base <br />2 <br />EA <br />950.00 <br />$1,900.00 <br />61 <br />Light Pole, 4" Square, 18' <br />2 <br />EA <br />1,700.00 <br />$3,400.00 <br />62 <br />63 <br />Light Fixture <br />Deciduous Tree, Sun Valley Red Maple, 2.5" cal. <br />4 <br />5 <br />EA <br />EA <br />1,750.00 <br />603.75 <br />$7,000.00 <br />$3,018.75 <br />64 <br />Deciduous Tree, Allegheny Serviceberry, 6' ht. <br />2 <br />EA <br />535.50 <br />$1,071.00 <br />65 <br />Deciduous Tree, Crimson Point Plum, 2" cal. <br />8 <br />EA <br />530.25 <br />$4,242.00 <br />66 <br />67 <br />Deciduous Tree, Regal Prince Oak, 2" cal. <br />Deciduous Shrub, Pee Wee Oakleaf Hydrangea <br />2 <br />29 <br />EA <br />EA <br />519.75 <br />38.27 <br />$1,039.50 <br />$1,109.83 <br />68 <br />Deciduous Shrub, Double Knockout Rose, 18-24" <br />17 <br />EA <br />37.10 <br />$630.70 <br />69 <br />70 <br />Evergreen Shrub, Sea Green Juniper, 18-30" <br />Evergreen Shrub, Blue Star Juniper, 18-24" <br />24 <br />6 <br />EA <br />EA <br />45.51 <br />52.50 <br />$1,092.24 <br />$315.00 <br />71 <br />Evergreen Shrub, Everlow Yew, 18-24" <br />26 <br />EA <br />39.75 <br />$1,033.50 <br />72 <br />73 <br />Perennial, Mainz Astilbe, #1 Cont. <br />Perennial, Sister Teresa Astilbe, #1 Cont. <br />40 <br />40 <br />EA <br />EA <br />15.75 <br />15.75 <br />$630.00 <br />$630.00 <br />74 <br />Perennial, Walker's Low Catmint, #1 Cont. <br />71 <br />EA <br />12.75 <br />$905.25 <br />75 <br />Topsoil <br />115 <br />CY <br />56.95 <br />$6,549.25 <br />76 <br />Turfgrass Seeding <br />9475 <br />SF <br />0.13 <br />$1,231.75 <br />77 <br />Erosion Control Blanket, EroNet DS75 <br />915 <br />SY <br />2.75 <br />$2,516.25 <br />78 <br />Shredded Hardwood Mulch <br />28 <br />CY <br />63.75 <br />$1,785.00 <br />79 <br />Landscape Edging, 5" Heavy Duty Plastic <br />180 <br />LF <br />6.75 <br />$1,215.00 <br />80 <br />Geotextile Landscaping Filter Fabric <br />35 <br />SY <br />2.43 <br />$85.05 <br />81 <br />Landscape Stone Mulch, 2" River Rock <br />6 <br />TON <br />78.58 <br />$471.48 <br />82 <br />90-Day Landscape Maintenanace Period <br />1 <br />LS <br />3,000.00 <br />$3,000.00 <br />BASE BID TOTAL $614,451.28 <br />Version 4/2/2019 Contractor's Bid for Public Works - 9 <br />