Laserfiche WebLink
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Scott Kreeger, Project Engineer <br />SUBJECT: Award Project No. 119-034 <br />Ductile Iron Pipes, Valves, and Hydrants <br />DATE: June 4, 2019 <br />w�orr�uoroo��r�auwuow,arw�umuoiouirro��nvveuu�mmmmmuuw,wouiwiw�,ri�wwuwuuuuiroim�rr v��uue�e wxu�ouw�mv��or� x�..r�wMinrmmmrc+iiomouoi�muwi�uuvs�w�m�mmm�uw�uw�uvuwawwwuw�.wm�urv.. uo�Nwwuwim�w�owv�oiowm�o�m owmwwawwu�iowoww�Poiwwawm uouo�mmomm�r�ww.muwmuv�¢mmr ��mtimmmmwn ^.. ww� <br />On May 14, 2019, the Board of Public Works opened and read bids for the above project. During <br />the review of the bid documents, it was observed that neither Core and Main or Ferguson <br />Waterworks could provide apprenticeship and training documentation required by the <br />Responsible Bidder Ordinance. The nature of the bid project is to acquire parts and resources for <br />the Water Department, rather than services or labors. After review by the City's Legal Department, <br />it was determined the apprenticeship and training documents are not applicable to this type of <br />project. <br />The bidders ranked as follows: <br />Engineering recommends award of a contract for Ductile Iron Pipes, Valves and Hydrants to <br />the lowest responsive / responsible bidder, Core and Main LP in the amount of $ 702,159.00. <br />Sufficient funds have been appropriated from Water Works Operations, 620-0640-606.23.62. <br />Please call with your questions (9245). <br />Enc. Bid Tabulation <br />