Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME: 2019 Community Crossings <br />PROJECT NUMBER: 119-015 <br />FOR BIDS DUE: May 28, 2019, 9:30 a.m.,(Local Time) <br />CONTRACTOR NAME: Walsh & Kelly, Inc. <br />Addendum 1 & 2 <br />DIVISION 3: LINDEN AVE. (MAYFLOWER TO LOMBARDY) <br />Item <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />No. <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />25,000.00 <br />$25,000.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />6,000.00 <br />$6,000.00 <br />3 <br />Coring <br />2 <br />EA <br />185.09 <br />$370.18 <br />4 <br />Milling, Up to 1.5" <br />8,550 <br />SY <br />1.35 <br />$11,542.50 <br />5 <br />Milling, Additional 2" <br />2,570 <br />SY <br />1.35 <br />$3,469.50 <br />6 <br />Compacted Aggregate Base <br />75 <br />TONS <br />25.00 <br />$1,875.00 <br />7 <br />HMA Surface, 9.5 mm — Type B <br />950 <br />TONS <br />68.00 <br />$64,600.00 <br />8 <br />HMA Wedge and Leveling — Type B <br />30 <br />TONS <br />68.00 <br />$2,040.00 <br />9 <br />HMA for Patching <br />30 <br />TONS <br />100.00 <br />$3,000.00 <br />10 <br />Tack Coat <br />5 <br />TONS <br />10.00 <br />$50.00 <br />11 <br />Joint Adhesive, Surface <br />4,620 <br />LF <br />0.60 <br />$2,772.00 <br />12 <br />Adjust Manhole to Grade <br />5 <br />EA <br />50.00 <br />$250.00 <br />13 <br />Adjust Inlet to Grade <br />7 <br />EA <br />50.00 <br />$350.00 <br />14 <br />Line, Thermoplastic, Solid, White, 4" <br />3700 <br />LF <br />0.54 <br />$1,998.00 <br />15 <br />Line, Thermoplastic, Solid, White, 24" <br />15 <br />LF <br />5.95 <br />$89.25 <br />16 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />210 <br />LF <br />0.99 <br />$207.90 <br />