My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05282019 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2019
>
05282019 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:20:53 PM
Creation date
6/11/2019 11:36:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />MAY 28, 2019 150 <br />1 <br />11 <br />OCTANE FORKLIFTS, INC.._ <br />4905 Lima Street <br />Denver, CO 80239 <br />Bid was signed by: J.R. Antczak <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Ten percent (10%) Bid Bond was submitted <br />:e <br />Description <br />I Year/Make/Model <br />Unit Price <br />See attached documents <br />2019 Octane FY30 <br />$29,872 <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />I Fully enclosed cab <br />$3,825 <br />$33,697 <br />HULL LIFT TRUCK <br />4221 Technology Drive <br />South Bend, IN 46628 <br />Bid was signed by: James Jones <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Ten percent (10%) Bid Security Check was submitted <br />Indiana Local Business Preference Claim Form submitted <br />V-301 <br />Description <br />I Year/Make/Model <br />Unit Price <br />Forklift Pneumatic <br />2019 Toyota 8FGU32 <br />$31,846 <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />Fully enclosed cab <br />$9,150 <br />$40,996 with optional full steel cab <br />Upon a motion made by Ms. Dorau, seconded by Ms. O'Sullivan and carried, the above bids <br />were referred to Central Services for review and recommendation. <br />OPENING OF QUOTATIONS — ELECTRIC GATE - PUBLIC WORKS SERVICE CENTER <br />(MVH/SEWAGE OPERATIONS & MAINTENANCE) <br />Ms. Maradik advised that this was the date set for the receiving and opening of sealed quotations <br />for the above referenced equipment. The following quotation was opened and read: <br />SUPERIOR ACCESS AND DOOR <br />13399 McKinley Hwy. <br />Mishawaka, IN 46545 <br />Quotation was submitted by Chris Loftus <br />QUOTATION: <br />Option (A) West Gate $22,655.00 <br />Option (B) East Gate $19,950.00 <br />Upon a motion made by Ms. Dorau, seconded by Ms. O'Sullivan and carried, the above <br />quotation was referred to Engineering for review and recommendation. Ms. Terri Swift, Street <br />Department stated they would not be awarding the quotation today, as stated on the agenda. <br />OPENING AND AWARD OF QUOTATIONS — APPROVE CONTRACT — ERSKINE WELL <br />VARIABLE FREQUENCY DRIVE INSTALLATION — PROJECT NO 119-032 (SSDA TIF) <br />Ms. Maradik advised that this was the date set for the receiving and opening of sealed quotations <br />for the above referenced project. The following quotations were opened and read: <br />HERRMAN & GOETZ, INC. <br />225 S. Lafayette Blvd. <br />South Bend, IN 46601 <br />Quotation was submitted by Larry Cripe <br />
The URL can be used to link to this page
Your browser does not support the video tag.