My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/03/1911 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1911
>
03/03/1911 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:51:21 PM
Creation date
6/6/2019 10:54:31 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/3/1911
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Board met at regular session at 10:oo A. M. all members present, <br />�, Petlti+� t w�c 3.reeea� ddf' ®mr ug o iert ow er s °aek mg fora grade on <br />'Dearborn Street from Michigan Avenue to Elwood Street. <br />The same was ref ered to the, City Engineer. <br />v Petitlont;_1received and referred to the City Engineer. asking that €6 grade <br />-be established, on South'Main Street from Jay Street South.. <br />Resolved by the BOARD of PUBLIC WORKS of the CITY of SOUTH BEND, <br />yINDIANA. That }permission is hereby grhhte(' the Indiana & laic igan Eectric <br />Coompany"�;tonbo.nbt mbtgti . iiti%p.,�.andn-ldisbharge�'pppeline in Colfax Avenue from <br />.the east bank of the St. Joseph River to said Company's Power --house, which <br />is located at the north east corner of Bridge Street and Colfax Avenue, said <br />permission shall be subject to t e following conditions. <br />Frist:- <br />The location of said intake and discharge pipes shall be along lines <br />.to be established by the City Civil Engineer. <br />Second: <br />The Indiana &11 Michigan Electric Company shall at their expense <br />,fconastruct a new concrete wing wall and protect the abutment at the south <br />east corner of the Colfax Avenue bridge. <br />Third : - <br />The Indiana & Michigan Electric Company shall construct a 10" <br />vitrified pipe sewer from the St. Joseph River to the west line of lot 6 in <br />Mack's Sub -Division for t e benefit of the City and abutting property owners. <br />The line and grade to be iven by the City Engineer. <br />+ourth: - <br />T. he Indiana & Michigan Company shall relay in a satisfactory manner <br />all pavement, cement side -walk and curbing taken pp and shall file a bond <br />in the sum of $ 1,000.00 good for a period of one year from the completion of <br />said., work, to guarantee the repaving and repairing of any defective work', <br />which may develop Within such specified time. <br />Fifth: - <br />All of the above shall be done at the risk of tie said Indiana <br />& Michigan Electric Corcpany, and they shall assume the responsibility and <br />risk of damages to the work or to the property on line of said wohk which <br />results from floods, backwater, caving of street, settling of foundation <br />of bridge or other causes whatsoever connected with the construction of said <br />work. <br />Sixth: - <br />The Board of Public Works reserves the right to appoint an <br />In6pect6mr, who shall be on the work during the construction of tie wigng <br />wall and relaying of the pavement, sidewalks and. curbing to see that said <br />,,:: w6kkis constructed in a proper manner. The Indiana & Michigan Electric Compay <br />shah. pay to the City of South Bend, the sum of 03.00 per day for each day <br />said Inspector is required. Said Inspector shall be under the direction b <br />of the City Engineer who shall have power to stop the work, if same is not <br />„being properly done, or if the material beng used is not of approved. quality or <br />fnr any other good and sufficient cause. <br />Seventh:- <br />', The time of competion of this work shall be 60 days from the date <br />of tethe starting. The time of completion is an essential element and tree sum of <br />$50.00 per day shall be paid the City of South Bend, for every day, over the <br />6.0 day that the street is closed to traffic, which sum it is agreed is the <br />;iquidated damages which the said City will sustain eahh day by reason of such <br />delay. <br />Ei ghth: - <br />All the work of replacing the pavement, walks, curbing andcon- <br />pongtructing of wing wall shall be under the supervision of the City Engineer <br />acting under the direction of the Board of Public Works, and all work shall be <br />,according to the plans and specifications on File in the office of said <br />. Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.