Laserfiche WebLink
T <br />WyrRIDA' sw DECEMBEr ?th. , 1921. CONTIATCED a <br />a H18 be hg the date set for the reeeivning bids on TRUNK Sewer <br />on EWING AVENue and PAVE mend.:on EWINg AVENue, bids filed but 4. A. ELLIOtt only member <br />of the BOARD present. SHE OPENing of all bids deferred until 1: ,P. M. THIS;9th <br />day of DECEMBer 1921 <br />- Pres cent <br />i <br />i <br />fRIDAy DECEMBer 9th., 1921. - <br />r BOARD m6 in sp <br />ecial session at l P.M. ADHN "* D P HAVEN absert . <br />BIDS were received on TRUNK sewer on ETING Avenue from MICHIGAN <br />STreet to ALLEY west of LAfAYEtte STREEt. <br />AI'D of GEO. HArrop <br />PLAN) <br />24 inch sewer per lin ft...................." 6.00 <br />30 inch vitrified pipe sewer per lin ft..... 11.20 <br />15 inch vitrified pipe sewer per lin ft...... 75.00 <br />12 inch vitrified pipe sewer per lin ft.......2.00 <br />10 inch vitrfied Dipe sewer per lin ft....... 2.00 <br />8 inch vitrified pipe sewer per lin ft....... .80 <br />6 inch vitrified pipe sewer per lin ft.......1.00 <br />MANHOLES per ft in depth.....................8..00 <br />MANHOes curbs andcvovers, eaeh...............18.QO <br />STORM water inlets, each....................12.00 <br />CHECK tor $ 5-33.00 <br />BID Of GEO. A HArrop <br />24 inch pipe sewer pr lin ft................6.00 <br />27 inch pipe sewer per tin ft............... 8.00 <br />15 inch vitrified pipe sewer per lin ft...... 3.00 <br />8 inch pipe sewer per lin ft................ .80 <br />�6 inch pipe sewer per lin ft................. 1.00 <br />MANHOLES per ft. in depth .................... 8.00 <br />STORM WAter inlets, each . ....................12.00 <br />CHEC 267.00 <br />r <br />BID Of WILLIStOx CQNStructi-on CO. <br />WALK.per sq. ft****** .... ..25 <br />curb per lin ft............................... ..60 <br />GRADINgper cu. yd...................:...,.. 1.00 <br />ASphalt pavement using TRINIDAd per sq. yd. 3.25 <br />ASPHALt pavement using MEXIean per sq. yd.. 3.05 <br />26 inlets each.............................25.00 <br />eombin'ed curb and gutter per lin ft........1.00 <br />ASPIALtic concrete pavement -using TRI??idad per sq. yd 2,88 <br />ASPHALtic concrete pavement using MEXIcan per sq. yd 2.68 <br />8 inch conduit pipe per lin f..:...................... 100 <br />STOrm water inlets, -each ............. ..................14.50 <br />?LTZ'Sinal curb per lin ft.............................. .40 <br />RESEtting inlets, each ................................ 4.00 <br />RESEtting.manholes covers, each......................•• 4.00 <br />CHEck$ 705.00 <br />SAME deferred until TUESDAy DECELIber. 13t1r: , 1921 at 10:00 A.19 <br />CONtract for grade, curb and walk on ROBinson STreet awarded to <br />F. N. BArnes at............. <br />.E,dward Pf.*-I �:� :.. Eke �� T�od ...a <br />Pjjj_jftBurant m.s a-p.iao Wici <br />Ar- Cd g <br />