Laserfiche WebLink
ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of ("Effective Date") <br />between <br />Board of Public Works Cit of South Bend. Indiana ("Owner") and <br />.hones Petrie Rafinski Corporation ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />Citv Pro" �ct Ntlthl 19 052. Wa findio Si Ira �e Plro ynun -- Phase l "Proj ct" �t <br />Engineer's Services under this Agreement are generally identified as follows: <br />The City of Soutli Bend is looking to install between 35 to 40 signs at various locations in the City as part <br />of the Wayfindi�a e Program — Phase 1 project. These signs range from pedestrian kiosk st le si ns <br />to existinpost mounted wayfindin si ns. The Cit is interested in having two separate document <br />packages prepared that will assist in the installation of these signs and the required foundations. The first <br />acka e is to include final si n locations and associated foundation desi �l% of 5 ki�ask st =ns anc�a to six <br />.� findin signs proposed aloe g Michigan, Street between LaSalle Avenue and Western Avenue. This <br />acka ye is to be included in the Michigan Street Reconstruction aro"ect 118-0' 5 as a change order. <br />The second acka e fc rl acted as a quote package, is to include the final location of the remainin2 number <br />of signs and the foundation design for those si ns that re uire foundations. This uote acka e is to also <br />include the fabrication and installation of all the identified wa finding si gnu, includ��ich <br />Street. <br />The followinR is the anticipated sco e of services for this ro'ect. <br />I. Michi an Street Wa findii Sign �rol_Ilid�ltlons <br />a. JPR will conduct a site visit with the City to identif the actual location of the si ri alon <br />Michigan Street. Careful attention to the exist ine the <br />final site locations. <br />b. Foundation designs will be prepared based oil (lie provided sign desi <br />Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />