Laserfiche WebLink
ENGINEERS JOINT CONTRACT <br />DOCUMENTS COMMITTEE <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of the date of latest required signature ("Effective Date") <br />between <br />Board of Public Works City of Sot1th Bend I11d1an ("Owner") and <br />Anie ican Structul gin nt , ("Engineer"). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />Wellhead Protection Plan 5-Year Update ("Project"). <br />Engineer's Services under this Agreement are generally identified as follows: <br />Preparation of the South Bend Wellhead Protection Plan 5-Year Update <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period of Service <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth <br />in Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services by January 1, 2020, assuming that notice to proceed is received <br />by June 1, 2019. <br />C. If the Project includes construction -related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete <br />construction not exceeding N/A months. If the actual time to complete construction exceeds the <br />number of months indicated, then Engineer's period of service and its total compensation shall be <br />appropriately adjusted. <br />Page 1 2019.00828 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright ©2008 National Society of Professional Eninecrs for EJCDC All rights reserved. <br />