My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Corby Ironwood Rockne Drive Project No 116-034 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Proposals - Corby Ironwood Rockne Drive Project No 116-034 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 12:55:31 PM
Creation date
5/29/2019 11:13:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUSAN All ,,,,,-AIE31 A <br />CONTRACT OVERSIGHT <br />BS, Civil Engineering, Purdue University, 1996 <br />Professional Engineer: IN <br />Susan's 32 years of consulting and public <br />sector experience includes administration, <br />project development, project management, <br />design, survey, and construction inspection for <br />a vast array of roadway and bridge projects. This includes a wide <br />range of projects employed in the public and private sector. Susan <br />has also been directly involved with the development, design, and <br />construction of over $100 million of local federal -aid projects. <br />REPRESENTATIVE MAGE T EXPERIENCE <br />» Cleveland Road Reconstruction - St. Joseph County <br />Construction Cost: $8.3 million (2019) <br />» CR 400S, Phase 1 & 2 - Cass County <br />Construction Cost: $1.8 million (Phase 1- 2017) & $2.7 million <br />(Phase 2 - 2018) <br />» live Street & Sample Street - St. Joseph County <br />City of South Bend Construction Cost: $8.7 million (2017) <br />»Gumwood RoadReconstruction, Phase 1 & 2 - St. Joseph <br />County Construction Cost: $7.6 million (2016) <br />TRACY B <br />PE <br />CONSTRUCTION INSPECTOR ME <br />BS, Civil Engineering, Purdue University, 1993 <br />Professional Engineer: IN I INDOT Certified <br />SiteManager I INDOT Certified Technician <br />Tracy is a skilled engineer with 25 years of <br />experience in the planning, design, and <br />construction observation of engineering <br />projects. She is co-founder of McCormick Engineering, a local <br />WBE and DBE firm. Tracy has successfully worked with our team <br />on numerous inspection projects. <br />REPRESENTATIVE INSPECTION EXPERIENCE <br />» Kercher Road from the Railroad to Dierdorff Road - <br />City of Goshen Construction Cost: $4.7 million (2019) <br />» Olive Street & Sample Street - St, Joseph County & <br />City of South Bend Construction Cost: $8.7 million (2017) <br />» Oumwood Road Reconstruction, Phase 1 & 2 - St, Joseph <br />County Construction Cost: $7.6 million (2016) <br />» Edison Road - City of South Bend <br />Construction Cost: $375,000 <br />» 169th Street Reconstruction - City of Hammond <br />Construction Cost: $6.6 million <br />RYAN LA K, PE <br />TECHNICAL ADVISOR <br />BS, Civil Engineering, Purdue University, 1996 <br />Professional Engineer: IN <br />Ryan has over 20 years of transportation <br />design, traffic, safety, and project <br />management experience. He offers a strong <br />technical knowledge with a public sector <br />perspective. Prior to joining the private sector, Ryan spent over 10 <br />years with St. Joseph County Highway Department and served as <br />Chief Design Engineer for three years. <br />REPRESENTATIVE DESIGN EXPERIENCE <br />» Cleveland Road Reconstruction - St. Joseph County <br />Construction Cost: $8.3 million (2019) <br />»Edison Road & Ironwood rive Corridor Rehabilitation - <br />City of South BendConstruction Cost: $1.4 million (2017) <br />»Lincoinway West Road Redesign - City of South Bend <br />Construction Cost: $1.4 million (2015) <br />»Western Averse Road Redesign - City of South Bend <br />Construction Cost: $950,000 (2015) <br />» CR 300 Sou - Cass County Construction Cost: $1.6 million <br />(2011) <br />SCOTTBOCKOVER <br />o CONSTRUCTION INSPECTOR <br />INDOT Certified siteManager I INDOTCE <br />Technician <br />Scott serves as a Construction Inspe <br />northern Indiana projects. He has w <br />a variety of road projects where he <br />gained knowledge of road and conc <br />construction practices and inspection. <br />REPRESENTATIVE INSPECTION EXPERIENCE <br />» Cleveland Road Reconstruction - Ste Joseph County <br />Construction Cost: $8.3 million (2019) <br />» Kercher Road Reconstruction, Phase I & II - City of Goshen <br />Construction Cost: $4.7 million (2019) & $4.1 million (2020) <br />» CR 400S, Phase 2 - Cass County Construction Cost: <br />$2.7 million (2018) <br />» Olive Street & Sample Street - St, Joseph County <br />City of South Bend Construction Cost: $8.7 million (2017) <br />» Two -Way Street Conversion - City of South Bend <br />Construction Cost: $20 million (2016) <br />
The URL can be used to link to this page
Your browser does not support the video tag.