Laserfiche WebLink
BID/PROPOSAL„�'� <br />CITY OF SOUTH BEND, <br />Project Name: 2019 Community Crossingsmmmmmmmmmmm G <br />Project Number: 119-015 <br />For Bids Due: May 28,2019, 9:30 a.m., Local Time <br />Contractor <br />Name: Rieth Riley Construction <br />Co. Inc. <br />$47.47 <br />$18,988.00 <br />6 <br />Compacted Aggregate Base <br />_... ._.,_......_..............._yp.................... .. <br />400 <br />TONS <br />.._ <br />.$9... ...... <br />0 99 <br />$200,905.92 <br />7 <br />HMA Surface 9.5 mm — Type . ._........................................ . <br />TONS <br />$113.10 <br />$6,786.00 <br />8 <br />HMA Wedge and Leveling —T. ....... .......................... <br />_ �. <br />_ .........__ <br />$172.30 <br />.... <br />$9,476.50 <br />9 <br />HMA for Patching <br />55 <br />TONS <br />$0.05 <br />$0.65 <br />10 <br />�.�....... <br />Tack Coat ................... ........ ww <br />13 <br />TONS <br />$0.05 <br />$600.00 <br />11 ......W...__ <br />Joint Adhesive, Surface <br />................................ <br />12,000 <br />LF <br />$250.00 <br />$1,500.00 <br />12 <br />mm._....._ <br />Adjust Manhole to Grade <br />................... <br />6 <br />EA <br />�-13, <br />EA <br />$250.00 <br />_ <br />$1,500.00mmmmmmmWWWWWWWWWWWWWWW <br />_ <br />Adjust Inlet to Grade <br />.......................................... <br />6 <br />14 <br />Line, Thermoplastic, Solid, White, 4" <br />�.� _ <br />11,840 <br />LF <br />$2.50 <br />$400.00 <br />15 <br />Line, Thermoplastic, Solid, White, 6" <br />160 <br />LF <br />$2.00 <br />$220.00 <br />16 _........... <br />Line, Thermoplastic, Solid, White, 8" <br />..................... <br />110 <br />LF <br />$0.45 <br />$5,557.50 <br />17 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />..............................._....._......... <br />12,350 <br />LF <br />$2.50 �...... <br />$375.00.._........ <br />18 .. <br />Line, Thermoplastic, Broken, White,12" <br />..Grooving <br />150 <br />LF <br />19 <br />�$0.35 <br />$8,46.6. <br />.50 <br />_. <br />for Pavement Markings, 4" <br />.......................... <br />24,190 <br />LF <br />Grooving for Pavement Markings, More than <br />.........._W...._�w <br />$2.00 <br />$840.00 <br />20 <br />.................w_. <br />w 4" <br />420 <br />LF <br />�..... <br />$165.38 <br />$4,961.40 <br />21 <br />Concrete Sidewalk, Remove <br />30 <br />SY <br />$90.39 <br />$2,711.70 <br />22 <br />Concrete Sidewalk, 4" <br />30 <br />SY <br />.�5 <br />$153.0 <br />$3'......061.00 <br />23 <br />Concrete Curb Ramp, Remove <br />20 <br />SY <br />........... <br />............... <br />$181.82_____ <br />$3,636.40 <br />24 <br />Concrete Curb Ramp <br />20 <br />SY <br />$84.00 <br />$1,260.00 <br />25 <br />Detectable Warning Surface <br />15 <br />SY <br />DIVISION 4 TOTAL <br />$391,479.02 <br />Addendum No. 2 <br />