My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2019 Community Crossings Project No 119-015 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - 2019 Community Crossings Project No 119-015 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:06:55 PM
Creation date
5/29/2019 11:00:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL<� <br />CITY OF SOUTH BEND <br />Project Name: 2019 Community Crossings <br />.... . _ ....... <br />.. <br />Project Number: 119-015 <br />For Bids Due: May W28, 2019, 9:W30 a.m., Local Time <br />Contractor <br />Name: Rieth-Riley Construction Co. Inc. <br />DIVISION <br />3: LINDEN AVE. (MAYFLOWER TO LOMBARDY) <br />....... <br />Item <br />No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />$6,069.76 <br />$6,069.76 <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />15,500.00 <br />$15,500.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />$546.55 <br />$1,093.10 <br />3 <br />Coring <br />2 <br />EA <br />ww <br />$1.95....._._ .... <br />$16,6�72.50�........ <br />4 <br />Milling, Up to 1.5" <br />,',"'�'�"�p� <br />SY <br />$3.03 <br />$7,787.10 <br />5 <br />Milling, Additional 2" <br />.........._.. <br />� <br />SY <br />...._....._ <br />$68.51 <br />$5,138 25 <br />6 <br />Compacted Aggregate Base <br />75 <br />TONS <br />�....... <br />µ....� ....... .._ .. _...... <br />$86.81 <br />$82,469.50 <br />7 <br />HMA Surface, 9.5 mm - Type B <br />9--�:)u <br />TONS <br />........_.._._._._._._............_......_...._.......................................... <br />$109.99 <br />$3,299.70 <br />8 <br />HMA Wedge and Leveling - Type B <br />30 <br />TONS <br />�...._ <br />........................................ <br />$143.51 <br />_ ...... <br />$4,305.30 <br />9 <br />HMA for Patching <br />30 <br />TONS <br />._._._..._ <br />.$0.05 ..................$0.25 <br />10 <br />Tack Coat <br />TONS <br />$0.05 <br />$231.00 <br />11 <br />Joint Adhesive, Surface <br />4,620 <br />LF <br />�. <br />_... ............mm. <br />$250.00 <br />_- .............. <br />$1,250.00 <br />12 <br />Adjust Manhole to Grade <br />5 <br />EA <br />___... <br />.—_________________________________....._W__---------------- w__........ ..... ....._ <br />$250.00 � <br />_ <br />$1,750.00 <br />13 <br />Adjust Inlet to Grade <br />7 <br />EA <br />$0.45 <br />$1,665.00 <br />14 <br />Line, Thermoplastic, Solid, White, 4" <br />3700 <br />LF <br />._......... ---------- __________W__..._.._......__...___....._................._.__wwwwwwwwwwww__ww...wwww__ww. <br />$5.00 <br />$ 7 5.00 ..._ _..................... <br />15 <br />Line, Thermoplastic, Solid, White, 24" <br />15 <br />LF <br />.�.....�.....................� � _.......... _........................ <br />.............. _. .....mm.. <br />E _..... <br />$0.45 <br />$94.50 <br />16 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />210 <br />LF <br />BIDDER: Rieth Riley Construction <br />Addendum No. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.