My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Gemini at Washington Colfax Apts Masonry and Stair Repair Div A Proj No 118-080B - Bokon Masonry Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Gemini at Washington Colfax Apts Masonry and Stair Repair Div A Proj No 118-080B - Bokon Masonry Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:16:52 AM
Creation date
5/29/2019 10:48:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
56571 Pear Rd. <br />South Bend IN 46619 <br />Name / Address <br />City of South Bend <br />Board of Public Works <br />1316 County -City Building <br />227 W. Jefferson Blvd. <br />South Bend, IN 46601-1830 <br />Description <br />GEMINI APARTMENTS AT WASHINGTON / STAIR TOWER <br />MASONRY REPAIRS. <br />4 Stair towers total, working from North to South, A, B, C, D. <br />(Labor and Materials.)..._, .__ <br />Stair Towers A, B, C <br />I.) Plug holes where brick are missing where stair towers where <br />attached to the building. <br />2 ) Tuck point the worst if the areas as needed, <br />3,) Using a man lift operating trom the empty lot next door to the <br />east. <br />4.) All materials, Labor and man lift rental rc`a $154.00. per square <br />foot. Approximately 137 SF. <br />(Labor and Materials.).,_,,......,... <br />Stair Tower D Separated On Its Own. <br />** This is separated out because of the extent of the damage on this <br />area of the building. It is a whole different Animal oil its own_** <br />1 ) Take down the entire corner that has been badly deteriorated by <br />the down spout from top of wall down to the top of footing Putting <br />in temp supports for the windows that are set in the masonry wall, <br />2,) Using a forklift with a bucket attachment for disposal of debris <br />and rubble in the lot east of the building <br />3 ) Rebuild entire corner with new brick to match the Chicago <br />Commons as close as possible. <br />4 ) Repair areas of brick damaged where the steel stairs were <br />connected to the building, <br />5 ) Replace one badly rusted steel lintel over tunnel at bottom of the <br />stair tower <br />Approximately 186 SF. () $141 88. SF <br />(Labor and Materials) ... _ .. _, .. .. <br />Looking Ibrward to doing business with you <br />ME <br />Estimate <br />Date Estimate # <br />4/14/2014 465... <br />Rate Total <br />21,152 00 I 21,15 2.00 <br />26,390.00 I 26,390.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.