My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-19 Public Works and Property Vacation
sbend
>
Public
>
Common Council
>
Minutes
>
Committee Meeting Minutes
>
2019
>
Public Works and Property Vacation
>
05-13-19 Public Works and Property Vacation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 2:08:37 PM
Creation date
5/24/2019 2:08:33 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Committee Mtg Minutes
City Counci - Date
5/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•CITY OF SOUTH BEND OFFICE OF THE CLERK <br /> Committeemember Broden stated, These are exclusively for repair. There are some areas in our <br /> City where there aren't sidewalks. I think of Greenlawn, specifically. There has,heretofore,never <br /> been a sidewalk on an area that clearly provides access to our Zoo and a lot of schools. That would <br /> not qualify, though. So, is there a way to perhaps look at some areas that don't have previously <br /> existing sidewalks but would meet a high community access need? <br /> Ms. Boyles replied, We've done it in the past. <br /> Committeemember Sharon L. McBride interjected, I actually made that request two(2)weeks ago. <br /> Committeemember Broden followed up, Good. But, we don't have anything formally in terms of <br /> the program,right? <br /> Ms. Boyles replied, Well formally we could do an appropriation for a project that we deem <br /> specific. We've done that in the past. We did an appropriation a few years ago, I believe, for the <br /> Ironwood sidewalks. So, we built those, and it was a budgeted project. I think it's challenging to <br /> fund our program internally to do a new sidewalk because our internal crews are doing the bulk of <br /> this work. That makes it so that it is effective and efficient in replacement. <br /> Ms. Boyles continued, So, there are a couple projects under construction at present that I would <br /> like to go over. We have a Safe Routes to School project underway in the LaSalle and Marquette <br /> School areas. We are going to put in more than two (2) miles of sidewalk. Also, a lot of curbs and <br /> curb ramps. This project should be complete by the end of the summer. I'll have to check on that. <br /> This is in that LPA project, which means we received eighty percent (80%) of the funding from <br /> INDOT and the federal government. We share in the cost twenty percent (20%). We are also <br /> extending sanitary sewer at the present time along US-20. We are putting in over 4,000 feet of <br /> twelve (12) inch diameter sewer. Of course, that extension will accommodate all kinds of new <br /> surfaces there near the interchange. This is almost a $700,000 project that will be done this <br /> summer. We are getting ready to, starting this week, to improve the Ironwood and Mishawaka <br /> Signaling. There are some ADA improvements as well as signal updates,new pavement markings <br /> and the very critical piece is the emergency vehicle signal preemption. We will be doing that at <br /> 20th and Mishawaka as well as Ironwood and Mishawaka. With the presence of the new Fire <br /> Station it will have signal pre-emption. So, whatever direction they go, they are going to need <br /> some help. That should be underway as we speak. We are also doing some sewer and manhole <br /> lining. We will continue to pick up work on the CSO Eighteen (18) sewer as we make our way <br /> toward Bowman Creek. We are also doing various other locations, smaller lining jobs throughout <br /> the City. We actually did this very large project in 2018 when we came back and awarded our <br /> 2019 funding with this project.This is a large project worth two(2)years of funding. We also have <br /> some small drainage projects going on right now. This is a result of the Local Roads and Streets <br /> money that we budgeted last year for storm water drainage projects, so, that is happening. Olivia <br /> Circle, Hawbaker Street, Creekwater, these are all residential areas where we are seeing some <br /> drainage concerns. <br /> She went on, I also want to highlight this project(referencing a slide in the presentation). This was <br /> one(1)that is really a pretty tremendous effort on behalf of many different members on our City's <br /> team. That top picture shows you what this street often looks like when it floods and when we get <br /> a good rain. Sean can attest to this. We would have to put Road Closed signs out for many years. <br /> EXCELLENCE ACCOUNTABILITY INNOVATION INCLUSION I EMPOWERMENT <br /> 455 County-City Building 227 W.Jefferson Bvld South Bend,Indiana 46601 p 574.235.9221 f 574.235.9173 TTD574.235.5567 www.southbendin.gov <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.