My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
QPA Special Purchase - Guild Associates Inc - Methane Analyzer
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
QPA Special Purchase - Guild Associates Inc - Methane Analyzer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:56:32 AM
Creation date
5/15/2019 4:01:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ii. H2O <br />iii. 02 <br />iv. VOCs' <br />v. Siloxanes' <br />vi. Heavy Hydrocarbons (C6+) <br />vii. Ammonia (NH3) <br />4. Product Compression: <br />a. Pressure up to 1,400 PSIG for high pressure interstate pipeline <br />b. CNG up to 4,500 PSIG with both slow fill and direct fill <br />' Upon request we can provide gas analysis from an independent 3rd party lab of an <br />operating commercial unit in landfill service to demonstrate removal capabilities of trace <br />organic components and siloxanes. <br />4. Price <br />CH4 Analyzer, Installation and Training $86,250 <br />Price is contingent upon acceptance of Guild terms and conditions. <br />Price includes time and expenses for Guild personnel to be onsite for installation, <br />validation of software and training as defined in the Scope. Onsite time is estimated at <br />3-4 days. <br />Detailed Breakdown of costs by task: For reference only, the major tasks and <br />approximate cost breakdown is as follows: <br />Task 1: Methane Analyzer assembly: <br />• Procurement of all direct and miscellaneous materials for assembly and <br />installation <br />• Guild Design labor <br />• Guild shop assembly labor <br />Sub -Total: $54,295 <br />Task 2: Methane Analyzer pre -installation programming and integration: <br />• Updating HMI <br />• Adding alarms/trips <br />• 1/0 configuration <br />• Documentation <br />Sub -Total: $13,245 <br />Page 4 of 5 <br />The information in this document is confidential & proprietary and cannot be reproduced or <br />shared without written permission from Guild Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.