My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Michigan Street Reconstruction Project No 118-075 - Walsh & Kelly Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Michigan Street Reconstruction Project No 118-075 - Walsh & Kelly Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:10:01 AM
Creation date
5/15/2019 3:42:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1316 COUNTY -CITY BUILDING <br />227 W.JEFFERSON BOULEVARD <br />SOUTH BEND, INDIANA 46601-1830 <br />Date: May 9, 2019 <br />To: All Plan Holders <br />PHONE 574/235-9251 <br />FAx 574/235-9171 <br />TDD 574/ 235-5567 <br />CITY OF SOUTH BEND PETE BuTTiGIEG, MAYOR <br />BOARD A ' !WORKS <br />Michigan Street Reconstruction <br />118-075 <br />Addendum No. 1 <br />From: Roger Nawrot, Project Manager <br />The items in this addendum are to become a part of the original documents as if included therein. Only <br />the noted items are affected, and the remainder of the original contract document is to remain in its <br />entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1 — CLARIFICATIONS <br />PART 2 — SPECIAL PROVISIONS <br />PART 3 — CONSTRUCTION DOCUMENTS <br />PART 1- CLARIFICATIONS <br />1.01 The Contractor shall remove and Replace concrete sidewalk as necessary for installation and/or <br />removal of all electrical and signal improvements. Remove to nearest control joint (TYP), <br />replacement concrete shall match to adjacent existing grades. <br />1.02 Where existing slot drain is located along the curb line and is to remain, the Contractor shall saw <br />cut at the edge of the existing gutter line, protect slot drain & gutter in place unless noted <br />otherwise in the plans. <br />1.03 The Contractor shall blanket concrete as necessary to accelerate concrete cure time to meet <br />proposed project phase times. <br />PART 2 — SPECIAL PROVISIONS <br />2.01 SPECIAL PROVISIONS, Pages 14-58 <br />1. REPLACE Pages 14-58 with the attached SPECIAL PROVISIONS pages 14-63.: <br />a. The following items had clarification updates: <br />i. XXII CONTRACT ALLOWANCES <br />ii. XXV DESCRIPTION OF WORK <br />iii. XXXIX CLEARING OF RIGHT-OF-WAY <br />
The URL can be used to link to this page
Your browser does not support the video tag.